Browse
Search
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2020
>
Agenda - 09-15-20 Virtual Business Meeting
>
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:28:37 PM
Creation date
9/10/2020 3:14:30 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hillsborough Industrial Site 2020 Existing PM <br />100: Old NC 86 & Rippy Lane/Waterstone Drive Timing Plan: PM Peak <br />Lanes, Volumes, Timings Synchro 10 Report <br />Stantec Page 2 <br />Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Queue Length 50th (ft)6 76 76 0 1 101 0 42 48 <br />Queue Length 95th (ft)26 129 129 40 8 217 20 70 133 <br />Internal Link Dist (ft)933 1361 1030 1228 <br />Turn Bay Length (ft)300 200 425 300 <br />Base Capacity (vph)254 322 323 551 484 2164 1360 400 2642 <br />Starvation Cap Reductn 0 00000000 <br />Spillback Cap Reductn 0 00000000 <br />Storage Cap Reductn 0 00000000 <br />Reduced v/c Ratio 0.05 0.31 0.31 0.33 0.01 0.30 0.11 0.28 0.23 <br />Intersection Summary <br />Area Type:Other <br />Cycle Length: 120 <br />Actuated Cycle Length: 120 <br />Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBT, Start of Green <br />Natural Cycle: 90 <br />Control Type: Actuated-Coordinated <br />Maximum v/c Ratio: 0.49 <br />Intersection Signal Delay: 16.4 Intersection LOS: B <br />Intersection Capacity Utilization 49.1%ICU Level of Service A <br />Analysis Period (min) 15 <br />Splits and Phases: 100: Old NC 86 & Rippy Lane/Waterstone Drive <br />253
The URL can be used to link to this page
Your browser does not support the video tag.