Browse
Search
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2020
>
Agenda - 09-15-20 Virtual Business Meeting
>
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:28:37 PM
Creation date
9/10/2020 3:14:30 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hillsborough Industrial Site 2020 Existing AM <br />110: Old NC 86 & I-40 WB Ramp Timing Plan: AM Peak <br />HCM 6th TWSC Synchro 10 Report <br />Stantec Page 1 <br />Intersection <br />Int Delay, s/veh 1 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Vol, veh/h 0 0 0 18 4 306 73 383 0 0 698 36 <br />Future Vol, veh/h 0 0 0 18 4 306 73 383 0 0 698 36 <br />Conflicting Peds, #/hr 0 00000000000 <br />Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free <br />RT Channelized - - None - - Free - - None - - None <br />Storage Length - - - 225 - 0 225 ----- <br />Veh in Median Storage, # - 2 - - 0 - - 0 - - 0 - <br />Grade, % - 0 - - 0 - - 0 - - 0 - <br />Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 <br />Heavy Vehicles, % 2 22222222222 <br />Mvmt Flow 0 0 0 20 4 340 81 426 0 0 776 40 <br /> <br />Major/Minor Minor1 Major1 Major2 <br />Conflicting Flow All 976 1404 - 816 0 - - - 0 <br /> Stage 1 588 588 - - - - - - - <br /> Stage 2 388 816 - - - - - - - <br />Critical Hdwy 6.636.53-4.13----- <br />Critical Hdwy Stg 1 5.43 5.53 - - - - - - - <br />Critical Hdwy Stg 2 5.83 5.53 - - - - - - - <br />Follow-up Hdwy 3.519 4.019 - 2.219 ----- <br />Pot Cap-1 Maneuver 263 139 0 810 - 0 0 - - <br /> Stage 1 554 495 0 - - 0 0 - - <br /> Stage 2 656 390 0 - - 0 0 - - <br />Platoon blocked, %-- - <br />Mov Cap-1 Maneuver 237 0 - 810 ----- <br />Mov Cap-2 Maneuver 237 0 - - - - - - - <br /> Stage 1 499 0 - - - - - - - <br /> Stage 2 656 0 - - - - - - - <br /> <br />Approach WB NB SB <br />HCM Control Delay, s 21.9 1.6 0 <br />HCM LOS C <br /> <br />Minor Lane/Major Mvmt NBL NBTWBLn1WBLn2 SBT SBR <br />Capacity (veh/h)810 - 237 - - - <br />HCM Lane V/C Ratio 0.1 - 0.103 - - - <br />HCM Control Delay (s) 9.9 - 21.9 0 - - <br />HCM Lane LOS A - C A - - <br />HCM 95th %tile Q(veh) 0.3 - 0.3 - - - <br />248
The URL can be used to link to this page
Your browser does not support the video tag.