Browse
Search
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2020
>
Agenda - 09-15-20 Virtual Business Meeting
>
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:28:37 PM
Creation date
9/10/2020 3:14:30 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Waterstone: Lots 9-11 – Hillsborough, NC <br />ES-2 <br />Table ES-1 <br />Traffic Generation – Waterstone <br />(Average Weekday Traffic) <br />Land <br />Use <br />Code <br />Land Use Density <br />AM Peak PM Peak <br />Enter Exit Enter Exit <br />210 Single-Family <br />Homes 334 d.u. 61 183 196 115 <br />220 Apartments 471 d.u. 47 188 180 97 <br />230 Townhomes 128 d.u. 11 52 50 24 <br />488 Soccer Complex 1 field 1 0 12 6 <br />540 Community College 1,250 students* 259 49 226 133 <br />610 Hospital 468,088 SF** 301 176 179 292 <br />720 Medical Office 153,000 SF 213 56 75 191 <br />820 Shopping Center 110,000 SF 102 63 307 332 <br />Internal Capture 65 65 174 174 <br />Pass-by Trips 0 0 85 81 <br />New External Trips 833 684 867 876 <br />*Note: Trip generation represents difference between 2,500 students and 1,250 students. <br />**Note: Trip generation represents difference between 810,000 SF and 341,912 SF of hospital. <br />Capacity analyses were performed using Synchro Version 9.1 software. Table ES-2 summarizes <br />the operation of the study intersections for the AM and PM peak hour traffic conditions. <br />Table ES-2 <br />Level-of-Service Summary <br />Condition AM Peak Hour <br />LOS (Delay) <br />PM Peak Hour <br />LOS (Delay) <br />Old NC 86 (Churton Street) & Waterstone Drive (Signalized) <br />Existing (2015) Traffic B (11.8)B (13.5) <br />Background (2020) Traffic B (11.9)B (13.7) <br />Build-out (2020) Traffic C (21.4)C (23.7) <br />185
The URL can be used to link to this page
Your browser does not support the video tag.