Orange County NC Website
NCDOT TIA Scoping Checklist <br />Effective Date: 10/01/2017 (Version 17-721) Page 5 of 7 <br /> <br />܈܈ Future Year Conditions <br />܈ Project Build-Out Year: 2023 <br />܆ Future Analysis Year(s): <br />܈ Identify below any funded/committed future transportation improvements, as well as any approved <br /> but incomplete developments near the site. <br />Funded STIP / Local CIP <br />Project Project Description Year Complete <br />U-5845 Churton Street Widening 2025 <br />I-3306A I-40 Widening 2023 <br /> <br /> <br />Nearby Approved <br />Development Location Future Land Use <br />(exclude any completed phases)Committed Improvements <br />Waterstone Waterstone Drive Mixed-Use None <br /> <br /> <br />܈ Annual Growth Factor: 1 % <br /> Justification/Data Source: Growth rate from prev. Settler's Pointe TIA <br />܈ Local Comprehensive Transportation Plan Compliance <br />܈ Identify Applicable Local Transportation Planning Documents <br />܆ Identify Applicable Roadways inside the Study Area <br />Road Name Classification <br />Speed <br />Limit Proposed Cross-Section <br />Proposed <br />Right-of-Way Compliance Requirements <br />Affect Study <br />Intersection # <br /> <br /> <br /> <br /> <br /> <br />Plan Hillsborough 2040 <br />171