Orange County NC Website
NCDOT TIA Scoping Checklist <br /> <br />Effective Date: 10/01/2017 (Version 17-721) Page 3 of 7 <br /> <br />܈܈ Trip Distribution <br /> ܈ Trip distribution diagrams are submitted concurrently with this document (attach separate sheets). <br />܆ Trip distribution diagrams will be submitted separately, along with supporting information, to the <br />District Engineer for review and approval prior to capacity analysis. The trip distribution shall be <br />based on the current and anticipated traffic patterns, as well as instructions noted below. <br />If required by the District Engineer, the following additional diagrams shall also be submitted: <br />܆ Mixed-Use Developments (separate diagrams for residential, commercial, and office trips) <br />܆ Inter-Development Trips (if ‘internal” trips cross public streets) <br />܆ Pass-By Trips <br />܆ Diverted Trips <br />܆ Each Analysis Period <br />܆ Mode Split <br /> ܆ Provide Data Source and Justification <br /> <br /> <br />܆ Identify proper infrastructure and accommodation for other modes of travel. <br />܈ Analysis Peak Periods: <br />܈ Weekday AM Peak 6:30-9:30 AM <br />܈ Weekday PM Peak 3:30-6:30 PM <br />܆ Weekday Midday Peak <br />܆ Weekday PM School Peak <br />܆ Weekend Peak <br />܆ Other <br /> <br />Mode Auto Period <br />AM Peak % % % <br />PM Peak % % % <br />Daily % % % <br /> % % % <br /> <br /> <br />169