Orange County NC Website
NCDOT Traffic Impact Analysis Need Screening / Scoping Request <br /> <br />Effective Date: 10/01/2017 (Version 17-721) Page 1 of 2 <br /> <br />A Traffic Impact Analysis (TIA) may be required for developments based on the site trip generation <br />estimates, site context, or at the discretion of the NCDOT District Engineer. The Applicant or the TIA <br />Consultant shall submit this form along with the site plan to the District Engineer to determine the TIA <br />need and, if a TIA is required, initiate the TIA scoping process. Without an approved scope, the TIA is <br />incomplete and will be rejected until the study is revised to conform to NCDOT’s TIA requirements. <br />Project Name: Hillsborough Industrial Site Previous Name: If Applicable Settler's Pointe TIA <br />Location: Hillsborough, NC County: Orange Municipality: Hillsboroug <br />Project Description: A.K.A. Research Triangle Logistics Park. <br />Greenfield development consisting of four warehouse buildings on one site <br />Project Contact: Applicant TIA Consultant <br />Company Name Barrister Commercial Group Stantec <br />Contact Person Frank Csapo Matt Peach, PE, PTOE <br />Phone Number 502-412-2800 919-865-7375 <br />Email FCsapo@barristercg.com matt.peach@stantec.com <br />Mailing Address 3810 Springhurst Boulevard, Suite 120 801 Jones Franklin Road, Suite 300 <br />Louisville, Kentucky 40241 Raleigh, NC 27606 <br />Site Plan Prepared By: Kimley-Horn & Associates Site Plan Date: 4/28/2020 <br />See site plan/vicinity map requirements on page 2. <br />Parcel Size: 181.5 Acre(s)Anticipated Build-Out Year: 2023 <br />Weekday Site Trip Generation - Do NOT adjust for mode split, pass-by, internal capture, or diverted trips. <br />ITE <br />LUC Proposed Land Use Size Unit Daily Trips Peak Hour <br />Type <br />AM Peak Hour Trips PM Peak Hour Trips Data <br />Source Enter Exit Total Enter Exit Total <br />150 Warehouse 2251200 sf 3648 Adj. Street 247 73 320 88 238 326 ITE Equation <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Total 2251200 sf 3648 247 73 320 88 238 326 <br />Refer to the current NCDOT Congestion Management Capacity Analysis Guidelines for acceptable trip calculation methods and data sources. <br />**Explain local or other data sources, if used: <br />܈ The estimated site trips meet NCDOT’s TIA trip threshold of 3,000 daily trips. <br />܈ The estimated site trips meet the municipal TIA trip threshold of 800 trips per day <br />܆ This project is located in a known STIP and/ or local CIP project # <br />܈ This project includes a rezoning request. <br />164