Browse
Search
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2020
>
Agenda - 09-15-20 Virtual Business Meeting
>
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:28:37 PM
Creation date
9/10/2020 3:14:30 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESEARCH TRIANGLE LOGISTICS PARK TRAFFIC IMPACT ANALYSIS <br />Conclusions <br />June 4, 2020 <br /> 34 <br /> <br />9.0 CONCLUSIONS <br />Using the traffic analysis presented herein, recommendations are provided to mitigate the impacts associated with <br />the proposed development. With the recommended improvements in-place all study intersections and approaches <br />operate at LOS D or better during both peak hours; with three (3) exceptions: <br />x The westbound left-turn from the I-40 Westbound ramp onto Old NC 86 operates at LOS F. Stop-controlled <br />approaches to intersections often operate with longer delays during peak hours. Additionally, the analysis shows <br />that the existing turn-lane storage is not exceeded. <br />x The eastbound and northbound approaches to the intersection of Old NC 86 at I-40 Eastbound ramp operates at <br />LOS E. However, the overall LOS at this intersection is D. <br />x The eastbound approach of the Service Road onto Old NC 86 operates at LOS E. Stop controlled approaches to <br />intersections often operate with longer delays during peak hours. <br />The analysis presented herein is conservative as it assumes that a significant portion of Waterstone is completed by <br />the time the proposed development is opened in 2023. Furthermore, NCDOT has two (2) planned projects in the <br />area in U-5845 (Churton Street Widening) and I-3306A (I-40 Widening) that will make further improvements to <br />transportation infrastructure within the study area. <br /> <br />157