Orange County NC Website
RESEARCH TRIANGLE LOGISTICS PARK TRAFFIC IMPACT ANALYSIS <br />Capacity Analysis <br />June 4, 2020 <br /> 27 <br /> <br />6.3 2023 BUILD CAPACITY ANALYSIS <br />As a result of the 2023 Build analysis, all intersections are expected to operate at LOS C or better in both peak <br />periods, with a few exceptions. Those are as follows: <br />x The westbound approach to the intersection of Old NC 86 at I-40 westbound ramps in both peak hours; <br />x The eastbound approach to the intersection of Old NC 86 at I-40 eastbound ramps in both peak hours; and <br />x The eastbound approach to the intersection of Old NC 86 at the Service Road in the PM peak hour. <br />The build level of service and delay is listed in Table 6. <br />150