Orange County NC Website
RESEARCH TRIANGLE LOGISTICS PARK TRAFFIC IMPACT ANALYSIS <br />Capacity Analysis <br />June 4, 2020 <br /> 24 <br /> <br />Capacity analyses were performed for the following conditions. <br />x 2020 Existing <br />x 2023 No-Build <br />x 2023 Build <br />x 2023 Build-Improved <br />The following existing intersections were included in the capacity analysis for the above scenarios; where applicable: <br />x Old NC 86 at Waterstone Drive / Rippy Lane <br />x Old NC 86 at I-40 WB Ramps; <br />x Old NC 86 at -40 EB Ramps; <br />x Old NC 86 at Service Road; and <br />x Old NC 86 at Davis Road. <br />The below proposed driveways were analyzed in the Build and Build with Improvements scenarios. <br />x Service Road at Warehouse A Driveway <br />x Service Road at Warehouse B Driveway <br />x Service Road at Warehouse C Driveway <br />x Davis Road at Warehouse D Driveway <br />All Synchro files and detailed printouts can be found in the Appendix. A brief summary of the results of the analyses <br />is provided in the following sub-sections. <br /> <br />147