Orange County NC Website
RESEARCH TRIANGLE LOGISTICS PARK TRAFFIC IMPACT ANALYSIS <br />Inventory of Traffic Conditions <br />June 4, 2020 <br /> 11 <br /> <br />Table 1: Existing Conditions <br />Road Name Road <br />Number <br />Primary Cross- <br />Section <br />Functional <br />Classification1 <br />2018 AADT2 <br />(vpd) <br />Speed <br />Limit <br />(mph) <br />Maintenance <br />Agency <br />Waterstone <br />Drive N/A 4-Lane Divided Local Road None <br />Provided 35 Hillsborough <br />Rippy Lane SR 1224 2-Lane <br />Undivided Local Road None <br />Provided <br />Un- <br />posted NCDOT <br />I-40 Ramps I-40 4-Lane Divided Other Principal <br />Arterial 74,000 65 NCDOT <br />Old NC 86 SR 1009 2-Lane <br />Undivided Minor Arterial 6,550 45 NCDOT <br />Service Road N/A 2-Lane <br />Undivided Local Road None <br />Provided 25 NCDOT <br />Davis Road SR 1129 2-Lane <br />Undivided Local Road 2,300 45 NCDOT <br />2.3 PLANNED PROJECTS <br />Two projects are planned within the study area. Those are U-5845 (Churton Street Widening) and I-3306A (I-40 <br />Widening). Both seek to make improvements to Old NC 86 at and north of the I-40 interchange, but no <br />improvements are planned in the immediate vicinity of the site. <br />The traffic forecast for I-3306A was revised in July 2019 and states that Assumptions and changes in the distribution <br />of population and employment in the forecast study area are implicit in the Triangle Regional Model (TRMv6) that was <br />updated in May of 2019. The rezoning for Settler’s Pointe occurred on January 23, 2018. Therefore, the zoning of <br />this project was included and therefore the development was accounted for in the traffic forecast. <br /> <br />134