Browse
Search
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2020
>
Agenda - 09-15-20 Virtual Business Meeting
>
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:28:37 PM
Creation date
9/10/2020 3:14:30 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESEARCH TRIANGLE LOGISTICS PARK TRAFFIC IMPACT ANALYSIS <br />Introduction <br />June 4, 2020 <br /> 7 <br /> <br />1.0 INTRODUCTION <br />The purpose of this report is to evaluate the traffic impacts of the proposed Research Triangle Logistics Park in <br />Hillsborough, Orange County, North Carolina. This development is located to the west of Old NC 86 between <br />Interstate 40 (I-40) and Davis Road. The development’s location is shown in Figure 1. The site plan is shown in <br />Figure 2. <br />The site currently consists of undeveloped forested land. Construction of the proposed development is anticipated to <br />be completed in 2023. At full build-out the site is envisioned to provide 2,251,200 total square feet of industrial <br />warehousing. <br />The purpose of this report is to evaluate the development in terms of projected vehicular traffic conditions, evaluate <br />the ability of the adjacent roadways to accommodate the additional traffic and to recommend transportation <br />improvements needed to mitigate congestion that may result from additional site traffic. This report presents trip <br />generation, trip distribution, traffic analyses, and recommendations for improvements needed to meet anticipated <br />traffic demands. The analysis examines the AM and PM peak hours for the 2020 Existing, 2023 No-Build, 2023 Build <br />without improvements, and 2023 Build with improvements. <br />A study was conducted for the development referred to as Settler’s Pointe in 2017. This development contained <br />warehousing in addition to several land uses not pursued as part of the Research Triangle Logistics Park. This study <br />is included in the Appendix. <br /> <br /> <br />130
The URL can be used to link to this page
Your browser does not support the video tag.