Browse
Search
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2020
>
Agenda - 09-15-20 Virtual Business Meeting
>
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:28:37 PM
Creation date
9/10/2020 3:14:30 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESEARCH TRIANGLE LOGISTICS PARK TRAFFIC IMPACT ANALYSIS <br /> v <br /> <br />RECOMMENDATIONS <br />Based on the findings of this study, specific improvements have been identified and are recommended to be <br />completed as part of the proposed development. These improvements are listed below. <br />Old NC 86 at Waterstone Drive / Rippy Lane <br />No improvements are recommended at this intersection. <br />Old NC 86 at I-40 Westbound Ramps <br />No improvements are recommended at this intersection. <br />Old NC 86 at I-40 Eastbound Ramps <br />x Install a traffic signal. <br />The 2017 Settler’s Pointe TIA concluded that this intersection met the criteria for installation of a traffic signal based <br />upon their review of the 2016 collected traffic data against Traffic Signal Warrant 3B (Peak Hour Vehicular Volume) <br />Old NC 86 at Service Road <br />x Construct an exclusive eastbound right-turn lane with 100 feet of full-width storage and appropriate taper. <br />x Restripe the northbound approach to provide 50 feet of full-width storage and appropriate taper. <br />Old NC 86 at Davis Road <br />x Install a traffic signal. It is recommended that this signal not be installed until Driveway D is constructed and <br />open to traffic. <br />Service Road at Warehouse A Driveway <br />x Construct Warehouse A Driveway as a single-lane approach operating under the control of a stop-sign. <br />Service Road at Warehouse B Driveway <br />x Construct Warehouse B Driveway as a single-lane approach operating under the control of a stop-sign. <br />Service Road at Warehouse C Driveway <br />x Construct Warehouse C Driveway as a single-lane approach operating under the control of a stop-sign. <br />Davis Road at Warehouse D Driveway <br />x Construct Warehouse D Driveway as a single-lane approach operating under the control of a stop-sign. <br />These recommendations are illustrated on Figure ES-2. <br /> <br />128
The URL can be used to link to this page
Your browser does not support the video tag.