Orange County NC Website
<br />• Highway projects #1 – 13 – Are currently in the CTP and requesting future highway <br />improvements along these segments should consider all Complete Street opportunities. <br />• Highway projects #14 – 26 – Staff requests these CTP amendments are included so that <br />they may qualify for Complete Street consideration and all opportunities. <br />o Cross Section 2A – 60’ right-of-way, 12’ travel lane, 5’ paved shoulder, rural areas <br />o Cross Section 2E – 60’ right-of-way, 11’ travel lane, bike lane and sidewalk, urban <br />areas <br />o Complete Street forms would be submitted requesting bike lane, sidewalk, side path <br />and/or transit be considered should such projects be submitted for future Strategic <br />Prioritization of Transportation (SPOT) process. <br /> <br />Even during the COVID-19 pandemic, an increasing number of people are exclusively using <br />automobiles as their primary means of travel with US roadways nearly restored to pre-pandemic <br />VMT levels. While the pandemic does have significant impact on NCDOT funding, development <br />continues to occur in Orange County and surrounding areas, leaving it to local jurisdictions to <br />plan for its future. <br /> <br />At August 19, 2020 OUTBoard meeting, staff was requested to draft a unifying statement for all <br />recommendations rather than separate statements for each project. The prepared drafts are <br />below: <br /> <br />Attachment 1, page 1 <br /> <br />The OUTBoard recommends that the BOCC approve projects 1-13, which already are in the <br />DCHC MPO CTP, to be considered for all Complete Streets opportunities. Attachment 1, page <br />1 contains the recommended cross-sections and multi-modal instruments and shall accompany <br />our recommendation. <br /> <br />Attachment 1, page 2 <br /> <br />The OUTBoard recommends that the BOCC approve projects 14-26 to be added to the DCHC <br />MPO CTP Amendment list and that they be considered for all Complete Streets <br />opportunities. Attachment 1, page 2 contains the recommended cross-sections and multi-modal <br />instruments and shall accompany our recommendation. <br /> <br />Authorization to proceed with DCHC MPO CTP amendments is scheduled to go before the <br />MPO Technical Committee in September and the DCHC MPO Board in October, which will <br />formally initiate the public process. Staff anticipates the amendment will be adopted by <br />December 2020. <br />• Staff will submit BOCC action, when complete, to the DCHC MPO Board for <br />consideration as part of its CTP Amendment. <br /> <br />FINANCIAL IMP ACT: There is no immediate financial impact associated with this item. <br /> <br />RECOMMENDATION(S): Staff requests that the OUT Board recommend Attachment 1 to the <br />BOCC for inclusion in the upcoming DCHC MPO CTP amendments. <br />8