Browse
Search
OUTBoard Agenda Packet - 091620
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2020
>
OUTBoard Agenda Packet - 091620
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2020 1:46:17 PM
Creation date
9/9/2020 1:45:41 PM
Metadata
Fields
Template:
BOCC
Date
9/16/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OUTBoard Minutes - 091620
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D R A F T <br />3 <br /> <br /> 107 <br />Ed Vaughn: I have a question about ID 20 – 23 – NC-86 between Hillsborough and Chapel Hill. Is there any way to 108 <br />add Shared Use Path? It would also get access to Blackwood Farm Park. It would be a great way to connect the two 109 <br />areas. 110 <br /> 111 <br />Nish Trivedi: We can but if that is what the OUTBoard recommends. As staff, we are not recommending anything 112 <br />specific complete street option, only that all options be available for these corridors. We would need you as the board 113 <br />to make that specific recommendation for NC-86. If you have any specifics like where you want bike lanes or 114 <br />sidewalks, we will need that support to hopefully get NCDOT and MPO to change their minds. 115 <br /> 116 <br />Eric Broo: It would be nice to be able to ride that corridor safety, in our next meeting would we just have to take a 117 <br />vote on what we want for these corridors. Is that correct? 118 <br /> 119 <br />Nish Trivedi: In your attachment 2, you will see the overall project list map and each individual project sheets. You 120 <br />will either recommend BOCC approve or not approve this project and provide comments. In the next meeting, I will 121 <br />request you approve attachment 1. If there are any other recommendations you would like to make, I would need you 122 <br />to vote on it as a board. 123 <br /> 124 <br />Eric Broo: Would these other recommendations be considered a hindrance, if we were to recommend a specific 125 <br />improvement, would that be considered favorable or hindrance in trying to get it approved in the amendment. 126 <br /> 127 <br />Nish Trivedi: We as a local jurisdiction do not have final say in the amendment process. The MPO Board does. All 128 <br />we can do is show support. I do not know what you want to see in these corridors, I would need those 129 <br />recommendations from you. If you recommend more than what staff is recommending, MPO may see this as local 130 <br />support and they may move them forward but I cannot speak for the MPO Board or NCDOT. Right now, they have 131 <br />given me a no and I’m trying to change that no. 132 <br /> 133 <br />Eric Broo: If we blanked approve this, will we have opportunity to make specific recommendations later? 134 <br /> 135 <br />Nish Trivedi: Yes, until a project gets committed in the future STIP, we will have more time to make 136 <br />recommendations. Right now the CTP is a visionary document and it is changing. Only after SPOT does design 137 <br />actually get involved. We will have more opportunities than. Right now I’m just trying to get you involved in the 138 <br />process to help me change their mind. 139 <br /> 140 <br />Heidi Perry: Will you give us a statement we can support or modify when we see this again? It would make this go 141 <br />faster if we had it. I think when you include Safety, you should include NC is a Vision Zero state. 142 <br /> 143 <br />Nish Trivedi: You can email me a draft or I can put something together. 144 <br /> 145 <br />Ed Vaughn: Where does the I-40 and NC-86 interchange fit into this? 146 <br /> 147 <br />Nish Trivedi: This interchange improvement has been delayed due to NCDOT funding issues as part of the I-40 148 <br />widening. It is split into 3 projects. 149 <br /> 150 <br />Eric Broo – Nish will you put a statement together and bring it before us at the next meeting. 151 <br /> 152 <br />Nish Trivedi: I’ll put something together and get it to you for the next meeting. Reviewed the Cross Section, rural 153 <br />areas will get the wide paved shoulder while urban areas like Hillsborough, Carrboro, Mebane, and Chapel Hill will 154 <br />get curb and gutter. 155 <br /> 156 <br />Nish Trivedi: This item is for information and review tonight and will go back to the OUTBoard as part of the 157 <br />September 16, 2020 OUTBoard/TAS meeting for recommendations 158 <br /> 159 <br />5
The URL can be used to link to this page
Your browser does not support the video tag.