Orange County NC Website
TIP/WBS # Description LET/Start <br />Date <br />Completion <br />Date Cost Status Project Lead <br />NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT <br />SS-6007E <br />49115.1.1 <br />49115.3.1 <br />All Way Stop installation and flashing beacon revisions at <br />the intersection of SR 1005 (Old Greensboro Road) and SR <br />1956 (Crawford Dairy Road/Orange Chapel Clover Garden <br />Road) <br />Jun. 2022 Sept. 2022 $28,800 Funds approved 3/5/20 but not released Dawn McPherson <br />R-5821A <br />47093.1.2 <br />47093.2.2 <br />47093.3.2 <br />Construct operational improvements including <br />Bicycle/Pedestrian accommodations on NC 54 from SR <br />1006 (Orange Grove Road) to SR 1107 /SR 1937 (Old <br />Fayetteville Road). <br />6/21/2022 FY2024 $3,194,000 Planning and design activities underway, <br />coordinating with NC54 West Corridor <br />Study <br />Chris Smitherman <br />I-3306AA <br />34178.1.4 <br />34178.2.3 <br />34178.3.7 <br />I-40 widening from I-85 to NC86 in Chapel Hill 3/21/2023 FY2025 $88,000,000 Planning and Design activities underway, <br />Environmental document completed <br />3/21/19 under I-3306A <br />Laura Sutton <br />I-5958 <br />45910.1.1 <br />45910.3.1 <br />Pavement Rehabilitation on I-40/I-85 from West of SR 1114 <br />(Buckhorn Road) to West of SR 1006 (Orange Grove Road) <br />11/21/2023 FY2025 $7,455,000 Funding approved 10/10/17 Chris Smitherman <br />U-5845 <br />50235.1.1 <br />50235.2.1 <br />50235.3.1 <br />Widen SR 1009 (South Churton Street) to multi-lanes from I- <br />40 to Eno River in Hillsborough <br />7/16/2024 FY 2027 $39,390,000 Planning and Design activities underway, <br />Coordinate with U-5848 and I-5967 <br />Laura Sutton <br />I-5967 <br />45917.1.1 <br />45917.2.1 <br />45917.3.1 <br />Interchange improvements at I-85 and SR 1009 (South <br />Churton Street) in Hillsborough <br />10/15/2024 FY2027 $16,900,000 Planning and Design activities underway, <br />Coordinate with I-0305 and U-5845 <br />Laura Sutton <br />I-5959 <br />45911.1.1 <br />45911.3.1 <br />Pavement Rehabilitation on I-85 from West of SR 1006 <br />(Orange Grove Road) to Durham County line <br />11/19/2024 FY2026 $11,155,000 Funding approved 10/10/17, Coordinate <br />with I-5967, I-5984 and I-0305 <br />Chris Smitherman <br />I-5984 <br />47530.1.1 <br />47530.2.1 <br />47530.3.1 <br />Interchange improvements at I-85 and NC 86 in <br />Hillsborough <br />11/18/2025 FY2027 $11,000,000 Planning and Design activities underway, <br />Coordinate with I-0305 and I-5959 <br />Laura Sutton <br />I-0305 <br />34142.1.2 <br />34142.2.2 <br />34142.3.2 <br />Widening of I-85 from west of SR1006 (Orange Grove <br />Road) in Orange Co. to west of SR 1400 (Sparger Road) in <br />Orange Co. <br />10/17/2028 FY2032 $132,000,000 Planning and design activities underway, <br />Project reinstated per 2020-2029 STIP <br />(funded project) and delete project I-5983 <br />Laura Sutton <br />Page 2 DCHCMPO June 2020 <br />MPO Board 9/9/2020 Item 20 <br />Page 8 of 10 <br />12