Browse
Search
OUTBoard Agenda Packet - 091620
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2020
>
OUTBoard Agenda Packet - 091620
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2020 1:46:17 PM
Creation date
9/9/2020 1:45:41 PM
Metadata
Fields
Template:
BOCC
Date
9/16/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OUTBoard Minutes - 091620
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TIP/WBS # Description LET/Start <br />Date <br />Completion <br />Date Cost Status Project Lead <br />W-5707K <br />48283 <br />Remove and replace existing curb & gutter and sidewalk, <br />add pedestrian signals, concrete island, and signal <br />modifications on SR 1010 (E. Main St / W. Franklin St) from <br />Brewer Ln to Graham St. in Chapel Hill and Carrboro <br />5/31/2019 Jul. 2020 $350,000 Construction - 100% complete, RTE final <br />inspection pending <br />Chris Smitherman <br />Derek Dixon <br />SM-5707H <br />48912.3.1 <br />“To Pass Bicycles, 4 ft Min Clearance or Change Lane” sign <br />installations on portions of no passing zones on SR 1107 <br />(Hillsborough Road) and SR 1104 (Dairyland Road). <br />Oct. 2019 Jun. 2020 $5,000 Signs installed 10/17/19 - 100% complete, <br />RTE final inspection pending <br />Dawn McPherson <br />SS-6007C <br />48888.1.1 <br />48888.3.1 <br />Guardrail installation on NC 86 just north of SR 1839 <br />(Alexander Drive). <br />Oct. 2020 Apr. 2021 $50,400 Funds approved 9/5/19 but not released Chad Reimakoski <br />Derek Dixon <br />P-5701 <br />46395.1.1 <br />46395.3.1 <br />Construct Platform, Passenger Rail Station Building at <br />Milepost 41.7 Norfolk Southern H-line in Hillsborough <br />6/30/2021 FY2023 $7,200,000 PE funding scheduled 7/1/2020, <br />Coordinate with U-5848 <br />Matthew Simmons <br />I-3306AB <br />34178.1.5 <br />34178.2.4 <br />34178.3.8 <br />I-40 widening from NC86 to Durham Co. line (US 15/501 <br />Interchange). Includes a portion of interchange <br />improvements I-3306AC in Chapel Hill <br />3/15/2022 FY2024 $37,635,000 Planning and design activities underway, <br />Environmental document completed <br />3/21/19 under I-3306A, LET combined <br />with I-3306AC and W-5707C <br />Laura Sutton <br />I-3306AC <br />34178.1.6 <br />34178.2.5 <br />34178.3.9 <br />Interchange improvements at I-40 and NC86 in Chapel Hill 3/15/2022 FY2024 $15,200,000 Planning and Design activities underway, <br />Environmental document completed <br />3/21/19 under I-3306A, LET combined <br />with I-3306AB and W-5707C <br />Laura Sutton <br />W-5707C <br />44853.1.3 <br />44853.3.3 <br />47490 <br />Revise pavement markings and overhead lane use signs for <br />removal of inside lane drop configuration on I-40 <br />Westbound in vicinity of US 15-501 interchange in Chapel <br />Hill. Resurfacing I-40 WB by use of contingency funds <br />3/15/2022 FY2022 $425,000 No bids on most recent letting, LET <br />combined with I-3306AB and AC <br />Chad Reimakoski <br />SS-4907CD <br />47936.1.1 <br />47936.2.1 <br />47936.3.1 <br />Horizontal curve improvements on SR 1710 (Old NC 10) <br />west of SR 1561/SR 1709 (Lawrence Road) east of <br />Hillsborough. Improvements consist of wedging pavement <br />and grading shoulders. <br />Jun. 2022 Nov. 2022 $261,000 Planning and design activities underway Chad Reimakoski <br />NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT <br />Page 1 DCHCMPO June 2020 <br />MPO Board 9/9/2020 Item 20 <br />Page 7 of 10 <br />11
The URL can be used to link to this page
Your browser does not support the video tag.