Browse
Search
Agenda - 08-21-2001-8b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 08-21-2001
>
Agenda - 08-21-2001-8b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 4:48:22 PM
Creation date
8/29/2008 10:33:47 AM
Metadata
Fields
Template:
BOCC
Date
8/21/2001
Document Type
Agenda
Agenda Item
8b
Document Relationships
Minutes - 08-21-2001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1( <br />2. 1~Io~ Residential Development <br />Amended 1 /4/94; 10/ 19/99 <br />DISTRICT IMPERVIOUS SURFACE/DETENTION POND REQUIREMENTS <br /> (NON-RESIDENTIAL) <br />UNIV-CA Same as Residential (See previous Table) <br />UNIV-PW <br />CANE-CA S-acre minimum lot size, with potential of up to five lots as small as two acres <br /> for lots of record October 19, 1999 (Amended 10-19-99); <br /> AND <br /> 6% impervious surface limit. <br /> * BMPs cannot be used to satisfy watershed impervious surface requirements. <br />U-ENO-CA 2-acre minimum, lot size <br />AND <br /> 6% impervious surface limit. <br /> * BMPs cannot be used to sans watershed im envious surfacer uirements. <br />CANE-PW 5-acre minimum lot size with potential of up to five lots as small as two acres <br /> for lots of record October 19, 1.999 (Amended 10-19-99); <br /> AND <br /> SO%ISR for all, fire stations and solid waste collection centers; <br /> AND <br /> 12%ISR for all, other non-residential uses; <br /> AND <br /> on-site infiltration of the first inch of stormwater runoff; <br /> AND <br /> a limit of 1.0% of the watershed for non-residential use (139 acres in CANE- <br /> PW). <br /> *BMPs cannot be used to satisfy watershed impervious surface requirements. <br />LITTLE-P W 2-acre minimum lot size <br /> AND <br /> SO%ISR for all,fire stations and solid waste collection centers; <br />AND <br /> 12%ISR for all other non-residential uses; <br /> AND <br /> on-site infiltration of the first inch of stormwater runoff; <br />AND <br /> a limit of 1.0% of the watershed for non-residential use (139 acres in CANE- <br /> PW). <br /> *BMPs cannot be used to sans im envious surface watershed re uirements. <br />* BMP's as mandated by the Stormwater Management Program for Lauds within the Neuse River Basin are allowed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.