Orange County NC Website
Project Category <br />Functional Service Area: <br />Department:X <br />Project Number: <br />Project Description/Justification: <br />Project Budget <br />Prior Years <br />Funding <br />Current  <br />Fiscal Year <br />2019‐20 <br />Year 1 <br />Fiscal Year <br />2020‐21 <br />Year 2 <br />Fiscal Year <br />2021‐22 <br />Year 3 <br />Fiscal Year <br />2022‐23 <br />Year 4 <br />Fiscal Year <br />2023‐24 <br />Year 5 <br />Fiscal Year <br />2024‐25 <br />Five <br />Year <br />Total <br />Year 6 <br />to <br />Year 10 <br />Appropriation <br />Professional Services 300,000 <br />Land/Building 425,000 <br />Construction/Repairs/Renovations 125,000 4,500,000 4,500,000 <br />Equipment/Furnishings 16,000 89,000 89,000 <br />Appropriation Total 866,000 4,589,000 4,589,000 <br />Revenues/Funding Source <br />Debt Financing 866,000 4,589,000 4,589,000 <br />Transfer from General Fund 16,000 <br />Revenues/Funding Source Total 882,000 4,589,000 4,589,000 <br />Impact on Operating Budget <br />Revenue (47,000) (47,000) (47,000) (141,000) (235,000) <br />Personnel 65,000 65,000 65,000 195,000 325,000 <br />Operations 5,000 22,000 22,000 22,000 66,000 110,000 <br />Impact on Operating Budget Total 5,000 40,000 40,000 40,000 120,000 200,000 <br />FINANCIAL SUMMARY <br />Project Type <br />New <br />Expansion <br />Renovation <br />Replacement <br />DEAPR Starting Date:7/1/2014 <br />20026 Completion Date:6/30/2021 <br />County Project Status:Active <br />Land was acquired in summer 2016 for the expansion of this facility. Funding was  <br />approved in FY 2017‐18 for design and engineering of the expansion, with an updated  <br />master plan currently being prepared internally. Following the master plan, design,  <br />engineering and construction/bid documents are expected in early 2021, with  <br />construction projected to occur in Year 2 (FY 2021‐22). The planned expansion will  <br />allow for additional fields, plus a new entrance and additional parking, restrooms,  <br />concession/equipment storage, and stormwater measures.  Current plans call for the  <br />addition of new Bermuda natural surface fields, although a financial assessment is  <br />underway looking at the potential for synthetic turf as an alternative for the new  <br />fields. <br />Community Services Proposed Bid Date:TBD <br />Soccer.com Soccer Center, Phase II <br />53