Orange County NC Website
Project Category <br />Functional Service Area: <br />Department: <br />Project Number:X <br />Project Description/Justification: <br />Project Budget <br />Prior Years <br />Funding <br />Current  <br />Fiscal Year <br />2019‐20 <br />Year 1 <br />Fiscal Year <br />2020‐21 <br />Year 2 <br />Fiscal Year <br />2021‐22 <br />Year 3 <br />Fiscal Year <br />2022‐23 <br />Year 4 <br />Fiscal Year <br />2023‐24 <br />Year 5 <br />Fiscal Year <br />2024‐25 <br />Five <br />Year <br />Total <br />Year 6 <br />to <br />Year 10 <br />Appropriation <br />Professional Services <br />Engineering Design ‐ Priority Projects 90,000 <br />Engineering Design ‐ Spillway Channel  <br />Replacement 270,000 270,000 <br />Construction/Repairs/Renovations <br />Erosion Control Barrier Repair 145,000 145,000 <br />Gate Actuator Replacement 125,000 125,000 <br />Intake Tower Demucking 5,000 1,800,000 1,800,000 <br />Intake Tower Painting 120,000 120,000 <br />Sluice Gate Replacement 145,000 145,000 <br />Spillway Channel Point Repairs 40,000 40,000 <br />Project Management <br />Materials Testing  ‐ Intake Tower  <br />Painting 5,000 5,000 <br />Materials Testing ‐ Erosion Control  <br />Barrier 5,000 5,000 <br />Materials Testing ‐ Spillway Channel  <br />Point Repairs 5,000 5,000 <br />Materials Testing ‐ Spillway Channel  <br />Replacement 100,000 100,000 <br />Appropriation Total 95,000 150,000 395,000 45,000 270,000 1,900,000 2,760,000 <br />Revenues/Funding Source <br />Debt Financing 95,000 150,000 395,000 45,000 270,000 1,900,000 2,760,000 <br />Revenues/Funding Source Total 95,000 150,000 395,000 45,000 270,000 1,900,000 2,760,000 <br />County Project Status:New <br />Community Services <br />Lake Orange is a Class II (WS‐II) public water supply reservoir owned by Orange  <br />County.  The lake was created in 1968 via the construction of an earthen dam and  <br />concrete spillway across the east fork of the Eno River.  The lake’s primary uses are  <br />public water supply as designated by North Carolina Department of Environmental  <br />Quality (NCDEQ) and maintenance of minimum (dry weather) flows in the Eno  <br />River, as defined within the Eno River Water Management Plan (a.k.a. the Eno River  <br />Capacity Use Agreement).  The Lake Orange dam was classified by NCDEQ as a  <br />“High Hazard” dam in August 2011 which means that failure of the dam could result  <br />in severe property damage and/or possible loss of life downstream. <br />In Fall 2018, NCDEQ and a private engineering firm conducted dam inspections that  <br />identified numerous deficiencies, due to the age of this 52‐year old structure.  This  <br />project would represent a multi‐year approach to repair these deficiencies, by  <br />continuing to address high priority needs in FY2020‐21.  The FY2020‐21 proposal is  <br />to repair the existing erosion control barrier and the associated materials testing for  <br />a total request of $150,000. <br />Proposed Bid Date:TBD <br />Lake Orange ‐ Dam Rehabilitation <br />FINANCIAL SUMMARY <br />Project Type <br />New <br />Expansion <br />Renovation <br />Replacement <br />Planning and Inspections Starting Date:7/1/2019 <br />10074 Completion Date:6/30/2025 <br />46