46
<br /> Lake Orange - Dam Rehabilitation
<br /> Project Category County Project Status: New Project Type
<br /> Functional Service Area: Community Services Proposed Bid Date: TBD New
<br /> Department: Planning and Inspections Starting Date: 7/1/2019 Expansion
<br /> Project Number: 10074 Completion Date: 6/30/2025 Renovation x
<br /> Replacement
<br /> Project Description/Justification:
<br /> Lake Orange is a Class II (WS-II) public water supply reservoir owned by Orange r
<br /> County. The lake was created in 1968 via the construction of an earthen dam and iiLkwo
<br /> concrete spillway across the east fork of the Eno River. The lake's primary uses arepublic water supply as designated by North Carolina Department of EnvironmentalQuality(NCDEQ) and maintenance of minimum (dry weather)flows in the Eno
<br /> River, as defined within the Eno River Water Management Plan (a.k.a.the Eno RiverCapacity Use Agreement). The Lake Orange dam was classified by NCDEQ as a <ti`
<br /> "High Hazard" dam in August 2011 which means that failure of the dam could result
<br /> in severe property damage and/or possible loss of life downstream.
<br /> In Fall 2018, NCDEQ and a private engineering firm conducted dam inspections that
<br /> identified numerous deficiencies, due to the age of this 52-year old structure. This
<br /> project would represent a multi-year approach to repair these deficiencies, by
<br /> continuing to address high priority needs in FY2020-21. The FY2020-21 proposal is
<br /> to repair the existing erosion control barrier and the associated materials testing for
<br /> a total request of$150,000.
<br /> FINANCIAL SUMMARY
<br /> Current Year 1 Year 2 Year 3 Year 4 Year 5 Five Year 6
<br /> Prior Years Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Year to
<br /> Project Budget Funding 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 Total Year10
<br /> Appropriation
<br /> Professional Services
<br /> Engineering Design-Priority Projects 90,000
<br /> Engineering Design-Spillway Channel
<br /> 270,000 270,000
<br /> Replacement
<br /> Construction/Repairs/Renovations
<br /> Erosion Control Barrier Repair 145,000 145,000
<br /> Gate Actuator Replacement 125,000 125,000
<br /> Intake Tower Demucking 5,000 1,800,000 1,800,000
<br /> Intake Tower Painting 120,000 120,000
<br /> Sluice Gate Replacement 145,000 145,000
<br /> Spillway Channel Point Repairs 40,000 40,000
<br /> Project Management
<br /> Materials Testing -Intake Tower
<br /> 5,000 5,000
<br /> Painting
<br /> Materials Testing-Erosion Control
<br /> Barrier 5,000 5,000
<br /> Materials Testing-Spillway Channel
<br /> 5,000 5,000
<br /> Point Repairs
<br /> Materials Testing-Spillway Channel
<br /> 100,000 100,000
<br /> Replacement
<br /> Appropriation Total 95,000 150,000 395,000 45,000 270,000 1,900,000 2,760,000
<br /> Revenues/Funding Source
<br /> Debt Financing 95,000 150,000 395,000 45,000 270,000 1,900,000 2,760,000
<br /> Revenues/Funding Source Total 95,000 150,000 395,000 45,000 270,000 1,900,000 2,760,000
<br />
|