2 <br /> Over the past five years, fundraising efforts have progressed and funds accumulated now total <br /> $137,542. Attachment 1 provides a certification of adequate development and construction <br /> funds. <br /> Swanson & Associates, a local Landscape Architecture firm, prepared design drawings for a <br /> flagpole, concrete and stone plaza and stone bench that would comprise Phase II of the <br /> memorial. Attachment 2 provides an overview of the design. <br /> The project was placed out to bid in early October 2019 and bids were opened on October 15, <br /> 2019. Unfortunately, the apparent low bid received was $232,425. Subsequent value <br /> engineering efforts failed to reconcile the difference between available funding and the <br /> scope/cost of work. The architect then revised the design and on April 30, 2020, obtained two <br /> additional quotes with the low bidder, Custom Stone NC provided a quote of $98,000. The <br /> architect received a separate quote of$10,000 for associated electrical lighting. <br /> Attachment 3 is an agreement for the Ownership, Operations and Maintenance of the Veterans <br /> Memorial. The agreement stipulates that upon completion of construction, the Memorial will <br /> become the property of Orange County and the County will be responsible for operations and <br /> maintenance of the Memorial and surrounding site. The agreement also requires the Orange <br /> County Veterans Memorial, Inc. to provide Orange County with $500/year for ongoing <br /> maintenance and upkeep of the Memorial. <br /> FINANCIAL IMPACT: The costs for design and construction of the project are contained within <br /> the chart below: <br /> Project Component Cost <br /> Design $15,000 <br /> Construction <br /> Custom Stone $98,000 <br /> Electrical $10,000 <br /> Construction Total $108,000 <br /> Contingency 5% $5,900 <br /> Project Total $128,900 <br /> Ongoing annual Operations and Maintenance (O&M) costs amount to $2,500. <br /> SOCIAL JUSTICE IMPACT: There is no Orange County Social Justice Goal impact associated <br /> with this item. However, the project will provide visible recognition to honor the service and <br /> sacrifice of Orange County veterans. <br /> ENVIRONMENTAL IMPACT: There is no Orange County Environmental Responsibility Goal <br /> impact associated with this project. <br /> RECOMMENDATION(S): The Manager recommends that the Board <br /> 1) Review and approve the certified budget and project design (Attachment 2) for Phase II <br /> of the Veterans Memorial project at the Southern Campus; <br /> 2) Authorize construction of the project, and authorize the County Manager to sign the <br /> construction contract and any amendments/change orders up to the $137,542 budgeted <br /> amount; and <br /> 3) Review and authorize the County Manager to sign the Ownership, Operations and <br /> Maintenance Agreement (Attachment 3). <br />