2 <br /> The amendment also updates existing references to the final normal pool elevation (NPE) of the <br /> reservoir, which according to the Town of Hillsborough is going to be 642 feet. In the summer of <br /> 2019, the Town indicated the NPE for the reservoir was going to be 643.9 feet and staff <br /> proceeded with an amendment based on this information. After being notified of the updated <br /> NPE, the amendment now references a NPE of 642 feet. <br /> BACKGROUND: Section 6.13.4 Minimum Buffer Widths for Watershed Protection Overlay <br /> Districts of the UDO establishes a 150 ft. wide setback around reservoirs. This area is intended <br /> to be left in an undeveloped state. Additionally, Section 4.2.9 Water Supply/ Sewage Disposal <br /> Facilities of the UDO establishes a 300 ft. setback for septic tanks from a reservoir. <br /> Section 4.2.2, specifically subsections (F) through (I), of the UDO establishes the applicability of <br /> watershed protection standards including establishing criteria defining those properties <br /> (developed and undeveloped) considered to be `grandfathered' with respect to applicable buffer <br /> (i.e. stream and reservoir) standards. <br /> In the 1990's The Town of Hillsborough began the necessary permitting processes at the State <br /> level to construct the West Fork on the Eno reservoir within the Cedar Grove Township of the <br /> county. <br /> Work was broken down into two phases, with Phase 1 including the Town purchasing property <br /> to expand the reservoir. The final boundary of the reservoir was established on February 11, <br /> 1997 with the recording of plats within the Orange County Registrar of Deeds Office denoting <br /> the Town's purchase of property along the West Fork of the Eno. Attachment 1 contains maps <br /> of the existing reservoir boundary, based on 2017 aerial photographic data, denoting the <br /> aforementioned 150 ft. (structure) and 300 ft. (septic) setback areas. <br /> Phase 2 of the project involves the actual clearing of property and expanding the existing NPE <br /> of the reservoir. The Town has already begun Phase 2 of the project, including land clearing <br /> and increasing the elevation of the dam. <br /> While the Town purchased sufficient property to accommodate the approved expansion of the <br /> actual reservoir, the required reservoir setback could still potentially impact adjacent parcels of <br /> property. Adjacent property owners have expressed concern the UDO does not specifically <br /> reference the expansion of the reservoir, thereby making their properties potentially non- <br /> conforming to applicable watershed management regulations (i.e. required reservoir setbacks). <br /> In an effort to address this concern, staff proposed a text amendment (Attachment 6) to <br /> reference the expansion of the West Fork on the Eno from the date the Town secured property <br /> allowing for the approved expansion. In consultation with the County Attorney's Office, staff has <br /> determined this date is February 12, 1997. <br /> While property owners are still required to abide by applicable setbacks per Section(s) 4.2.9 and <br /> 6.13.4 of the UDO, owners will have greater latitude in demonstrating compliance with <br /> applicable standards. This amendment will not necessarily allow for additional development of <br /> structures closer to the actual reservoir. It will, however, recognize the conforming status of <br /> existing development and not arbitrarily make same non-conforming. The status can be <br /> important with respect to property transactions and mortgage applications. <br />