Browse
Search
Planning Board - 080520 Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2020
>
Planning Board - 080520 Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2020 12:12:18 PM
Creation date
8/17/2020 11:57:13 AM
Metadata
Fields
Template:
BOCC
Date
8/5/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
080520 Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c. Prior to the approval of a site plan allowing development within the <br />Project, the County will need documentation from the Town of <br />Hillsborough indicating there is sufficient water and sewer capacity to <br />serve the project. A lack of water and/or sewer capacity for a proposed <br />use shall result in the denial of the site plan; <br />d. The Orange County and Town of Hillsborough Fire Marshal(s), in <br />consultation with the Town of Hillsborough Utility Director, shall review and <br />approve location(s) of proposed water and sewer lines prior to the <br />initiation of land disturbing activity; <br />e. The Orange County and Town of Hillsborough Fire Marshal(s) shall review <br />and offer comment on: <br />i. Road layout and construction methodology, <br />ii. Location of fire lanes, <br />iii. Location of fire hydrants, and <br />iv. Location of the proposed stand-pipe(s). <br />as part of all site plan review. <br />f. Each site plan shall be required to demonstrate compliance with Section <br />6.16 Environmental Assessment of the UDO. In those cases where <br />development exceeds established thresholds, a formal Environmental <br />Impact Statement (EIS) may be required allowing for site plan approval; <br />g. In addition to the standards detailed in Section 2.5 of the UDO, all <br />landscaping plans shall include information denoting the proposed method <br />of care (i.e. underground sprinklers, maintenance personnel, etc.) for the <br />development. <br />h. Identified conflicts associated with landscaping shall be resolved prior to <br />the approval of the site plan for a given project. Required plantings shall <br />not be reduced to accommodate a conflict with utilities or roadway issues; <br />i. For all site plans submitted for the Project the Orange Rural Volunteer Fire <br />Department shall be considered a member of the County Development <br />Advisory Committee (DAC) as outlined in Section 1.9 of the UDO. <br /> <br /> <br />V. PERFORMANCE STANDARDS: <br />a. The Project shall comply with Section(s) 6.4.2 through 6.4.7 of the UDO <br />inclusive; <br />b. Solid Waste Management: The following specific standards shall apply: <br />317
The URL can be used to link to this page
Your browser does not support the video tag.