Browse
Search
Planning Board - 080520 Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2020
>
Planning Board - 080520 Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2020 12:12:18 PM
Creation date
8/17/2020 11:57:13 AM
Metadata
Fields
Template:
BOCC
Date
8/5/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
080520 Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c. The Zoning Atlas for Orange County shall be designated MPD-CZ. <br />Development shall be in accordance with the approved application packet, <br />master concept plan, and the conditions detailed herein. <br /> <br />II. ACCESS AND TRANSPORTATION: <br />a. Internal roadways shall be developed in accordance with Section 6.10 (A) <br />of the UDO. Internal streets shall be privately maintained; <br />b. All internal and external roadway construction/improvements shall be <br />completed or appropriately bonded prior to the issuance of a Certificate of <br />Compliance (C of C) allowing the occupancy of a structure triggering <br />completion of same; <br />c. External roadway improvements shall be constructed in accordance with <br />NC Department of Transportation requirements and guidelines, approved <br />Traffic Impact Analysis (TIA), and the standards outlined herein; <br />d. The right-of-way for Service Road shall be extended to the western edge <br />of the PIN 9863-71-8857 to serve as a future access point for adjacent <br />land area to the west; <br />e. Final roadway layout, including pavement widths and driveways, shall be <br />approved by the Town of Hillsborough and Orange County Fire Marshal’s <br />office as part of the final site plan review process; <br />f. Commercial/truck traffic exiting the Project onto Davis Road shall be <br />limited to turning left. No right turns of commercial vehicles shall be <br />permitted onto Davis Road; <br /> STAFF COMMENT: Staff has started to hear concerns from local <br />residents over traffic accessing Davis Road. This condition was <br />suggested as a means to channeling commercial truck/large <br />vehicle traffic away from existing residential areas west of the <br />Project. Having said that both the applicant and staff have <br />wondered how such a condition could be enforced. <br />g. Site plan submittals shall be required to demonstrate internal/external <br />traffic improvements necessary to address development impacts <br />consistent with the submitted Transportation Impact Analysis (TIA); <br />h. Additional right-of-way necessary to support roadway improvements shall <br />be secured in accordance with North Carolina Department of <br />Transportation right-of-way acquisition processes. The right-of-way shall <br />be secured prior to the County accepting a site plan application proposing <br />development requiring same; <br />i. Any and all internal streets, sidewalks, bicycle lanes, etc. shall be <br />designated for public access/use; <br />314
The URL can be used to link to this page
Your browser does not support the video tag.