Browse
Search
Planning Board - 080520 Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2020
>
Planning Board - 080520 Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2020 12:12:18 PM
Creation date
8/17/2020 11:57:13 AM
Metadata
Fields
Template:
BOCC
Date
8/5/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
080520 Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 14 <br /> <br />kimley-horn.com 421 Fayetteville Street, Suite 600, Raleigh, NC 27601 919 677 2000 <br /> <br />Further, revise the Sheet to contain the proposed planting schedule (i.e. <br />amount of foliage for every 100 linear ft. of the Project) consistent with <br />previous direction. Staff recommends use of a planting detail on the Sheet <br />supporting this description and offers the following illustrative example as a <br />guide: <br />Note: not taken from County UDO. Graphic is for illustrative purposes only. <br /> <br />Response: Planting detail will be added as requested to the master plans <br /> <br />35. Comment: Page 13 – I.1.i – Provide the following additional detail on Sheet C-2: <br />1. A typical public road access cross section detail for the individual <br />development areas; <br />2. A typical interior roadway design standard (i.e. cross section) including <br />drainage detail(s) and explanation of how drainage will be handled by interior <br />road systems if at all; <br />3. If there is a proposed layout (i.e. creation of individual parcels allowing for <br />development) please denote same on this map; <br />4. Provide language indicating if denoted stormwater control measures (SCMs) <br />are: <br />a. For illustrative purposes (i.e. final SCM location shall be determined with <br />the submittal of a formal stormwater management plan in accordance with <br />the UDO); <br />b. Are anticipated to serve as master drainage basin areas or for specific <br />'pods’. <br /> <br />Response: 1. The access road is a private road and no cross section will be provided. <br />2. The majority of interior roadway drainage will be handled by onsite SCMs. <br />3. Individual parcels have been noted in this resubmittal. <br />4. The SCMs are based on master drainage basins and illustrative in nature. <br />36. Comment: Page 13 – I.1.ii – Sheet C-4: Section 6.7.1 (B) (6) of the UDO requires a map <br />detailing the utility master plan for the project (Sheet C-4). While the Sheet C-4 <br />275
The URL can be used to link to this page
Your browser does not support the video tag.