Browse
Search
Planning Board - 080520 Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2020
>
Planning Board - 080520 Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2020 12:12:18 PM
Creation date
8/17/2020 11:57:13 AM
Metadata
Fields
Template:
BOCC
Date
8/5/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
080520 Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Settlers Point <br />(approved) <br />RTLP Proposal EDH-5 zoning <br />Setbacks <br />- <br />structures: <br />Perimeter <br />(external to <br />project) <br />100 ft. (non EDD zoned <br />property) <br />100 ft. building setback <br />and 50 ft. parking <br />lot/access road setback <br />(western/southern <br />property line) <br />50 ft. setback (eastern <br />property line) <br />N/A 4 <br />External Road 50 ft. 25 ft. (Service Drive) <br />100 ft. (Davis Road) N/A <br />Front 25 ft. (internal roads) Not specified 50 ft. <br />Side 25 ft. Not specified 20 ft. <br />Rear 25 ft. Not specified 40 ft. <br />Land Use Buffers: <br />• 100 ft. perimeter <br />buffer; <br />• 50 ft. buffer along <br />Old NC Highway 86; <br />• 25 ft. buffer along <br />Service Road; <br />• 30% of a buildings <br />perimeter shall be <br />landscaped. <br />• 50 ft. buffer along <br />western and southern <br />property lines; <br />• 25 ft. buffer along <br />eastern property line; <br />• 25 ft. buffer along <br />Service Road and <br />Davis Road; <br />• 20% of a buildings <br />perimeter shall be <br />landscaped. <br />• 100 ft. perimeter buffer <br />for adjacent properties <br />not zoned EDD; <br />• Buffers based on land <br />use, range from 20 ft. to <br />100 ft. (Interstate <br />Highway – MTC buffer) <br />Parking <br />• Overall parking <br />standard: 1 space <br />for every 300 sq.ft. of <br />building area <br />Overall parking standard: <br />1 space per 750 sq.ft. of <br />office space and 1 space <br />per 3,000 sq.ft. of <br />additional indoor area. <br />Parking based on land use – <br />range would require: <br />• Retail and Office: 1 <br />space for every 200 <br />sq.ft. gross floor area; <br />• Manufacturing: 1 <br />space per employee <br />on largest shift; <br />• Delivery Service: 1 <br />space for every <br />employee on max <br />shift plus 1 space per <br />800 sq.ft. of gross <br />floor area <br /> <br />4 Per Section 6.8.12 (C) of the UDO, a 100 ft. vegetative buffer is required to be provided at the boundary of all Economic <br />Development districts. <br />210
The URL can be used to link to this page
Your browser does not support the video tag.