Browse
Search
Planning Board - 081920 Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2020
>
Planning Board - 081920 Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2020 12:13:04 PM
Creation date
8/17/2020 11:56:01 AM
Metadata
Fields
Template:
BOCC
Date
8/19/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
081920 Spec Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HCM 6th TWSC <br />110: Old NC 86 & I-40 WB Ramp 08/05/2020 <br />Hillsborough Industrial Site 7:00 am 03/19/2020 2023 Build-Improved AM Synchro 10 Report <br />Stantec Page 1 <br />Intersection <br />Int Delay, s/veh 5.5 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Vol, veh/h 0 0 0 93 4 470 93 517 0 0 915 95 <br />Future Vol, veh/h 0 0 0 93 4 470 93 517 0 0 915 95 <br />Conflicting Peds, #/hr 0 00000000000 <br />Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free <br />RT Channelized - - None - - Free - - None - - None <br />Storage Length - - - 225 - 0 225 ----- <br />Veh in Median Storage, # - 2 - - 0 - - 0 - - 0 - <br />Grade, % - 0 - - 0 - - 0 - - 0 - <br />Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 <br />Heavy Vehicles, % 2 22222222222 <br />Mvmt Flow 0 0 0 103 4 522 103 574 0 0 1017 106 <br /> <br />Major/Minor Minor1 Major1 Major2 <br />Conflicting Flow All 1289 1903 - 1123 0 - - - 0 <br /> Stage 1 780 780 - - - - - - - <br /> Stage 2 509 1123 - - - - - - - <br />Critical Hdwy 6.636.53-4.13----- <br />Critical Hdwy Stg 1 5.43 5.53 - - - - - - - <br />Critical Hdwy Stg 2 5.83 5.53 - - - - - - - <br />Follow-up Hdwy 3.519 4.019 - 2.219 ----- <br />Pot Cap-1 Maneuver 168 68 0 620 - 0 0 - - <br /> Stage 1 451 405 0 - - 0 0 - - <br /> Stage 2 569 280 0 - - 0 0 - - <br />Platoon blocked, %-- - <br />Mov Cap-1 Maneuver 140 0 - 620 ----- <br />Mov Cap-2 Maneuver 140 0 - - - - - - - <br /> Stage 1 376 0 - - - - - - - <br /> Stage 2 569 0 - - - - - - - <br /> <br />Approach WB NB SB <br />HCM Control Delay, s 86.6 1.8 0 <br />HCM LOS F <br /> <br />Minor Lane/Major Mvmt NBL NBTWBLn1WBLn2 SBT SBR <br />Capacity (veh/h)620 - 140 - - - <br />HCM Lane V/C Ratio 0.167 - 0.77 - - - <br />HCM Control Delay (s) 12 - 86.6 0 - - <br />HCM Lane LOS B - F A - - <br />HCM 95th %tile Q(veh) 0.6 - 4.7 - - - <br />69
The URL can be used to link to this page
Your browser does not support the video tag.