Browse
Search
Planning Board - 081920 Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2020
>
Planning Board - 081920 Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2020 12:13:04 PM
Creation date
8/17/2020 11:56:01 AM
Metadata
Fields
Template:
BOCC
Date
8/19/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
081920 Spec Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />x Construct an exclusive northbound left turn lane with 125’ of full storage and <br />appropriate transitions <br />x Construct and exclusive southbound right turn lane with 100’ of full storage and <br />appropriate transitions. <br />x Construct and exclusive eastbound right turn lane with 200’ full storage and <br />appropriate transitions. <br /> <br />Alternate improvements will need to be considered based on the final determination of <br />the intersection configuration. <br /> <br />Old NC 86 and Davis Road Intersection: <br /> <br />The analysis indicates a significant increase in delay and drop in LOS from B to D on the <br />eastbound approach with the addition of site traffic. The TIA recommends installation of <br />a traffic signal at this location. The applicant should provide additional traffic signal <br />warrant assessment supporting this recommendation. Regardless of final determination <br />regarding signalization, the following improvements are required to ensure safe and <br />efficient operation. <br /> <br />x Construct an exclusive northbound left turn lane with 100’ of full storage and <br />appropriate transitions. <br />x Construct an exclusive southbound right turn lane with 100’ of full storage and <br />appropriate transition. <br /> <br />Service Road and Site Driveway A,B,C Intersections: <br /> <br />We concur with the recommendation to construct each of these accesses as a two lane- <br />two-way approach operated under stop sign control. <br /> <br />Each access will need to provide a minimum internal protected stem length of 100’ <br /> <br /> <br />Davis Road and Site Driveway D intersections: <br /> <br />We concur with the recommendation to construct this access as a two lane-two-way <br />approach operated under stop sign control. <br /> <br />Provide a minimum internal protected stem length of 100’. <br /> <br />The following improvement is required to better accommodate commercial vehicle <br />maneuvers and to ensure safe and efficient operation at this location: <br /> <br />x Construct and exclusive westbound right turn with 100’ of full storage and <br />appropriate transitions. <br /> <br /> <br />44
The URL can be used to link to this page
Your browser does not support the video tag.