Browse
Search
Agenda - 06-19-2001-9d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 06-19-2001
>
Agenda - 06-19-2001-9d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 3:17:55 PM
Creation date
8/29/2008 10:33:30 AM
Metadata
Fields
Template:
BOCC
Date
6/19/2001
Document Type
Agenda
Agenda Item
9d
Document Relationships
Minutes - 06-19-2001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
28 <br />(4) Conducted by local governments, <br />(5) Funded in whale or in .part by the State or the United States. <br />Section 5 General Requirements for Areas Other Than University <br />Lake Cane Creek and U er Eno Protected Watershed Areas <br />A. Protection of Property <br />Person(s) conducting land-disturbing activities shall take all reasonable <br />measures to protect all public and private properly from damage by such <br />activities. This requirement shall apply to any areas to be disturbed, regardless of <br />the size of the area to be uncovered. <br />B. Erosion Control Plan Requirement <br />Prior to the commencement of any land-disturbing activity that will result in <br />the uncovering of more than 20,000 square feet of land, the person(s) conducting <br />the land-disturbing activity must prepare and submit an Erasion Control Plan for <br />the proposed site. The Plan must be approved and a Grading Permit obtained <br />prior to the start of the disturbance. <br />Section 6.1 General Requirements for University„Lake Cane Creek, <br />,, ,---., <br />and U er Eno Protected Watershed Areas <br />A. Plan Requirement <br />Except as otherwise provided in subsection B., an erasion and <br />sedimentation control plan, shall be prepared and filed with and approved <br />by the Erosian Control Division prior to the commencement of any land- <br />disturbing activity within the University Lake. Cane Creek, and Upper <br />Eno Protected Watershed Areas. <br />B. Plan Waiver <br />The person(s) conducting the land-disturbing activity need not submit an <br />erosion control plan ifi such person, obtains an Erosian Control Plan Waiver <br />Form from the Erosian Control Division. An application for this form shall <br />be submitted and shall contain the name, address, and phone number of <br />the developer and owner, a description and drawing of the proposed <br />development or activity, the location of the develapmer~t, and any other <br />information requested by the Orange County Erosian Control Officer that <br />
The URL can be used to link to this page
Your browser does not support the video tag.