Orange County NC Website
13 <br />2. The land-disturbing activity is not to be conducted in <br />connection with any of the following types of developments: <br />a. shopping centers <br />b. industrial and commercial .facilities <br />c. major subdivisions <br />d. roads <br />e. any activity involving the temporary or permanent storage <br />(above or below ground) of any noxious, toxic, or <br />hazardous substance, including fuel storage facilities. <br />3. The proposed land-disturbing activity will not: <br />a. significantly increase ar decrease the rate or volume of <br />surface water runoff; <br />b. significantly contribute to the degradation of water runoff; <br />c. have a significant adverse impact on a wetland, <br />watercourse, or University Lake, Cane Creek, and <br />Upper Eno Protected Watershed Areas; <br />d. occur within a buffer area circumscribing University <br />Lake, Cane Creek, and Upper Eno Protected Watershed <br />Areas. <br />C. Protection of Property <br />Persons conducting land-disturbing activity shall take all reasonable <br />measures to protect all public and private property from damage by such <br />activities. This requirement shall apply to any area to be disturbed. <br />Section 7 Basic Control Objectives <br />An Erosion and Sedimentation Control Plan may be disapproved pursuant to <br />Section 18 of this ordinance if the plan fails to address the fallowing control <br />objectives: <br />A. Identify Critical Areas <br />On-site areas which are subject to severe erosion, and off-site areas <br />which are especially vulnerable to damage from erosion and/or <br />sedimentation, are to be identified and receive special attention, and <br />appropriate mitigative measures are to be taken to protect those areas. <br />B. Plan for Erosion Control <br />Design the development and prepare the site plan so that the necessary <br />sediment-trapping devices and erasion control measures can be <br />