Orange County NC Website
6 <br /> 7. Time to complete (0 to 3 pts): <br /> • Project can be completed or show clear positive impacts within two years or less. <br /> CFE Proiect Scoring Table: <br /> Amount <br /> and <br /> Social Local Duration <br /> Justice Efficient Capacity Economic of <br /> Racial Emissions use of of Develop- Engage- Time to <br /> Cost Equity Reduced Funds Applicant ment ment Complete <br /> Project Estimate f5ptsl fq�Rw 14 is tIpW 3 pis): 3 Pis): 3 Pis): Total Rank* <br /> Total <br /> (Max for <br /> 2020-21: <br /> $478,657) <br /> *All projects, including those that tied in their scoring and those that exceed the funding limit will be placed <br /> in rank order by CFE voting. <br />