Browse
Search
Agenda - 06-19-2001-8p
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 06-19-2001
>
Agenda - 06-19-2001-8p
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 3:21:52 PM
Creation date
8/29/2008 10:33:19 AM
Metadata
Fields
Template:
BOCC
Date
6/19/2001
Document Type
Agenda
Agenda Item
8p
Document Relationships
2001 S Solid Waste - Brooks Contracting of Goldston NC for Food Waste Collection and Composting
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2001
Minutes - 06-19-2001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 5 <br />Time of Callection <br />4 <br />Contractor shall collect the food waste, segregated and placed in the containers For collection, three times per <br />week, unless otherwise agreed to in advance. The County shall: notify the generators of this schedule. <br />Holiday schedules may vary and certain locations may not require pickups. These establishments will be <br />agreed to by the contractor and County representatives. <br />Collection shall take place in such a manner as not to disrupt normal business activity, general safety, <br />pedestrian or vehicular traffic. <br />SECTION 6 <br />Collection Containers <br />The County, the contractor or business shall provide food waste collection containers as agreed to by the <br />parties. The containers shall be of a type approved by the County and Contractor and meeting all applicable <br />health codes and standards. These businesses shall include at least those exceeding two tons per month of <br />compostables and now receiving compostables collection service per attachment A, or as agreed to by the <br />parties. <br />The title to the containers shall remain with their owners. The businesses shall have responsibility for the <br />replacement of the food waste collection containers if they are lost, stolen, damaged or destroyed except by <br />act~.on of the contractor or County. The County or contractor shall supply additional containers as needed for <br />additional volume but not as replacements where the County or contractor was not at fault for loss or <br />damage. The County will be responsible for maintenance and replacement parts or repairs of those <br />containers provided by the County. Contractor or generator will be responsible .for maintenance and <br />replacement parts or repairs of those containers provided by the contractor or generator respectively. <br />SECTION 7 <br />Transportation of Collected Food Wastes <br />Contractor shall transport the collected food waste materials to its processing site. Contractor shall take title <br />and have access to the food waste materials upon placement in the bin by participating businesses in <br />accordance with Section 3 and shall be responsible for processing separated food wastes and shall retain all <br />of the benefits from use of this material. Separated food wastes shall be the property of Contractor. <br />SECTION 8 <br />Labor and Casts <br />Contractor shall, at his sole cost and expense, except as otherwise provided herein, furnish all labor and <br />equipment required to perform collection of separated food waste materials pwrsuant to this Agreement. <br />SECTION 9 <br />Missed Pick-Up <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.