Browse
Search
Agenda - 06-19-2001-8o
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 06-19-2001
>
Agenda - 06-19-2001-8o
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 3:22:25 PM
Creation date
8/29/2008 10:33:17 AM
Metadata
Fields
Template:
BOCC
Date
6/19/2001
Document Type
Agenda
Agenda Item
8o
Document Relationships
2001 S Solid Waste - Waste Industries Inc fpr Curbside Recycling
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2001
Minutes - 06-19-2001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
If County and Contractor mutually agree to extend this contract beyond initial term, actual costs <br />for future years are to be negotiated annually. The formula for negotiating future casts is to be <br />as follows: <br />The cost per household for any year shall not exceed the cost per household for the previous <br />year multiplied by a factor equal to the Bureau of Labor Statistics Consumer Price Index for <br />Transportation for the South Urban region as measured in January of the current year and <br />compared to January of the previous year. The cost for In-Town Curbside may be reduced <br />$0.06 per home per month for each increment of 5 homes per hour collection efficiency over 50 <br />stops per hour. <br />For example: the cast per household for 2003-2004 shall be allowed to increase above the 2002- <br />2003 price by an amount equal to the Bureau of Labor Statistics Consumer Price Index for <br />Transportation for the South Urban region as measured in January 2003 and compared to <br />January 2002. The cost for In-Town Curbside shall be reduced $0.06 per home for each <br />increment of 5 homes per hour collection efficiency over 50 stops per hour. <br />e) Expansion or Reduction in Number of Units Serviced <br />The contract maybe expanded or reduced at the option of County to include additional or fewer. <br />residential homes and adjacent small businesses, schools, institutions, churches, and pedestrian <br />recycling stations. If legislation or ordinances are passed which significantly impact the <br />participation in either program (Rural or In-Town), the cost of service for that program maybe <br />renegotiated between the Contractor and County. <br />SECTION 4 <br />Performance Sharing <br />Performance Sharing shall apply to In-Town Curbside collection only, and will be based on <br />measured improvements in operational productivity. Any increase in productivity will be measured <br />against a base of 50 homes per hour collected. 'This measurement shall be based on the actual bin <br />set out rate.' If an increase in productivity is measured, for each five homes per hour improvement <br />above the base of 50, Contractor will reduce the cost of the monthly invoice by $0.06 per resident. <br />The homes per hour calculation will be based on the total Set Outs per month divided by the, total <br />truck hours required to for the curbside collection vehicles to collect, transport, and unload the <br />recyclable materials. This calculation will be made on a monthly basis from daily reports of total <br />set outs and truck hours. This data will originate from Contractor's daily truck information <br />accumulated each month. Contractor shall furnish the information needed to make such a <br />calculation, and Contractor will make this calculation. Contractor will include both the data used to <br />make said calculation and the result of said calculation with the required monthly report. In the <br />event that an improvement in productivity is determined to have taken place during any month, the <br />cost of collection shall be reduced by $0.06 per household billed. This reduction in collection cast <br />per household shall be in effect for the month in which the increase in productivity was measured <br />and for all months that follow throughout the remainder of the contract. <br />
The URL can be used to link to this page
Your browser does not support the video tag.