Browse
Search
Agenda - 06-19-2001-8o
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 06-19-2001
>
Agenda - 06-19-2001-8o
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 3:22:25 PM
Creation date
8/29/2008 10:33:17 AM
Metadata
Fields
Template:
BOCC
Date
6/19/2001
Document Type
Agenda
Agenda Item
8o
Document Relationships
2001 S Solid Waste - Waste Industries Inc fpr Curbside Recycling
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2001
Minutes - 06-19-2001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 <br />SECTION 17 <br />Protection of Rec clable Materials <br />County agrees to take such steps as may be reasonably necessary to protect Contractor's ownership <br />of all Recyclable Materials placed in the'recycling containers far collection by Contractor under the <br />terms of this Contract and shall consider adopting anti-scavenging ordinances, if necessary, to <br />provide such protection. <br />SECTION 18 <br />Permits and License <br />Contractor, at its sole cost and expense, shall maintain throughout the term of this Contract all <br />permits, licenses and approvals necessary or required for Contractor to perform the work and <br />services described herein, including but not limited to the collection of Recyclable Materials and <br />operation of the Processing Center. <br />SECTION 19 <br />Independent Contractor <br />Contractor sha11 perform all work and services described herein as an independent contractor and <br />not as an officer, agent, servant or employee of County. Contractor shall have exclusive control of <br />and the exclusive right to control the details of the services and work performed hereunder and all <br />persons performing the same and nothing herein shall be constructed as creating a partnership or <br />joint venture between County and Contractor. No person performing any of the work or services <br />described hereunder shall be considered an officer, agent, servant or employee of County, and no <br />such person shall be entitled to any benefits available or granted to employees of County. <br />SECTION 20 <br />Non-Assignment <br />Neither Contractor nor County shall assign, transfer, convey, or otherwise hypothecate this Contract <br />or their rights, duties or obligations hereunder ar any part thereof without the prior written consent <br />of the other. <br />SECTION 21 <br />Com fiance with aws and Re la 'ons <br />Contractor agrees that, in the operation of the Processing Center and the performance of work and <br />services under this Contract, Contractor will qualify under and comply with any and all Federal, <br />State and local laws and regulations now in effect, or hereafter enacted during the term of this <br />Contract, which are applicable to Contractor, its employees, agents or subcontractors, if any; with <br />respect to safety or the wank and services described herein. <br />
The URL can be used to link to this page
Your browser does not support the video tag.