Orange County NC Website
~. o <br />SECTION 10 <br />Transportation and Temuorarv Storage o Recyclable Materials <br />Contractor shall transport the collected Recyclable.Materials to its Processing Site(s). Contractor <br />shall take title to the Recyclable Materials (except dry-cell batteries) upon placement in the <br />Recycling Container by residents and shall be responsible for the sale of such recyclable materials <br />and all of the proceeds of the sales. Recyclable Materials except dry-cell batteries shall be property <br />of Contractor. <br />No uncontaminated recyclable materials collected in this program shall be landfilled: Landfilling or <br />incinerating recyclables shall result in a penalty of $250 per incident of unauthari~ed disposal to a <br />landfill or incinerator. <br />County has arrangements with the Town of Chapel Hill to provide a loading dock and temporazy <br />storage at the Town of Chapel Hill Public Works Facility located at 1099 Airport Road. Contractor <br />may, with explicit permission of County and the Town of Chapel Hill, make use of this facility in a <br />manner cooperative with other users. Contractor, along with other site users, shall be responsible <br />for keeping this area clean, safe and free of blowing trash or debris from its operation. No mare <br />than eight (S) roll-off containers for the storage of recyclable materials belonging to Contractor shall <br />accumulate at this site. If more than eight containers accumulate, County or the Town of Chapel <br />Hill may remove the containers at the expense of Contractor after 2d hours written or faxed notice <br />to Contractor. <br />Contractor maybe asked to occasionally provide County access to the roll-off containers used to <br />collect and temporazily store recyclable materials at the loading dock facility located at 1099 Airport <br />Road. When and if necessary, and with Contractor's approval, County may use said roll-off <br />containers to deposit recyclables collected by its commercial recycling program: Contractor shall <br />take possession of and title to said materials at the time said materials aze deposited into the roll-off <br />containers, by County. Contractor shall enjoy any revenue gained from the marketing of said <br />materials. <br />Contractor's failure to clean the temporary storage site within two (2) working days of written or <br />faxed notification by County may result in County hiring a service to clean the area with the costs of <br />the service to be deducted from the following month's invoice. Cost of cleaning service shall not <br />exceed $250.00 without due notification of Contractor. <br />Contractor at its own expense may choose to pay for any necessary repairs or improvements to the <br />concrete pads, retaining walls, and/or drainage systems that have been built at the temporary loading <br />dock. Estimated casts of specific repairs or unprovements may be negotiated with County. <br />SECTION 11 <br />Labor and Casts <br />Contractor shall, at its sole cost and expense, except as otherwise provided herein, fiunish all labor <br />and equipment required to perform curbside collection of Recyclable Materials pursuant to this <br />Agreement. <br />