Orange County NC Website
6 <br /> The district researched industry standards for facility capital funding for K-12 institutions and <br /> believes the annual allocation for capital funding currently received is below recommended <br /> levels to properly maintain facilities. Findings include the following annual capital allocations: <br /> • Recommended amount to "regularly upgrade existing facilities' systems, components, <br /> fixtures, equipment, and finishes as they reach the end of their anticipated life <br /> expectancy; systematically reduce the backlog of deferred maintenance that has <br /> accumulated; and alter existing facilities to respond to changing educational <br /> requirements." _ $16,379,112 (1) <br /> • Recommended amount to make sure buildings are "clean and in good working order." _ <br /> $12,284,334 (2) <br /> • The above are based on 3 & 4% of replacement costs. Utilizing a rate of combined 5% _ <br /> $20,473,891 which is $12 million below current expenses. <br /> • The states with the lowest shares of M&O spending as a percentage of the total budget <br /> were Georgia (7.6 percent), Minnesota (7.7 percent), and North Carolina (8.1 percent). <br /> Those with the highest shares were Oklahoma (11.1 percent), Arizona (12.1 percent), <br /> and Alaska (12.9 percent). CHCCS is at 9.6% (3) <br /> • The states that spent the least per student on M&O were Utah ($614), Idaho ($639), and <br /> North Carolina ($733). At the other end of the range were Alaska ($2,096), New Jersey <br /> ($1,923), and New York ($1,759). (4) <br /> Footnotes <br /> 1. Calculated using Current Replacement Value (CRV) x Gross Sq Ft. x 4% _ $192 x 2,132,697 <br /> x 192 x .04 = $16,379,112. Source: State of Our Schools <br /> 2. 3% of CRV Source: State of Our Schools <br /> 3. CHCSS Budget line of"Operational support services" /Total operating expense = <br /> 13,831,080 / 144,247,500. 9.56% was average share of M&O for schools nationwide in 2008- <br /> 2009- includes payroll for M&O. Source: American Schools and Universities M&O Cost Study <br /> 4. See page 15 of State of Our Schools <br /> Priorities for Capital Projects — page 7 <br /> Utilizing facility assessment information and feedback from building occupants the following <br /> priorities are used for setting priorities for capital projects: <br /> • Fire, Life, Health & Safety related projects <br /> • Building projects that increase Student Capacity <br /> • End of Life Systems (roofs, mechanical systems, carpets, plumbing, etc.) <br /> • Building Envelope Systems (brick veneer, drainage/gutters, windows, doors, etc.) <br /> • Sustainability projects (lighting, cost savings, environmental controls, etc.) <br /> • General maintenance & repair projects (painting, parking lots, athletic areas, etc.) <br /> Building Operation Costs <br /> Utility Cost for 2018-2019 <br /> Site Elec., Gas + Water Cost per sf <br /> Culbreth Middle $ 119,904 $ 0.89 <br /> School <br /> McDougle Campus $ 247,047 $ 0.91 <br /> East Chapel Hill High $ 301,972 $ 0.95 <br /> School <br /> Scroggs Elementary $ 96,418 $ 0.95 <br />