11 <br /> Facility Name SAPFO capacity 1:17 Option 2 increased Option 3 increased <br /> Capacity (517) capacity (637) <br /> Carrboro ES 473 44 164 <br /> Ephesus ES 400 117 237 <br /> Estes Hill ES 483 34 154 <br /> FPG ES 474 43 43 <br /> Glenwood ES 379 138 138 <br /> Seawell ES 402 115 235 <br /> Total Capacity <br /> Increases 491 971 <br /> The district is in the process of completing individual capital profiles to further highlight the <br /> critical needs, repairs, and upgrades required to properly sustain and maintain older school <br /> facilities. These nine facilities were designated as the highest priority for capital renovations <br /> during the 2016 bond campaign based on the previous comprehensive facilities assessment <br /> along with community and stakeholder input. <br /> Patrick Abele said 2024 is the next time a bond can be done for these costs. He said all <br /> of these numbers are estimates. He said, for some schools, staff would not recommend option <br /> 3. <br /> Commissioner McKee asked if the sustainable renovations would add 20-25 years of life <br /> expectancy. <br /> Patrick Abele said yes, and if millions of dollars is going to be spent, there should be <br /> some useful life that can come from those renovations. He said the life expectancy of <br /> educational facilities is often overlooked in discussions. <br /> Commissioner McKee asked if the construction costs for Northside ES could be <br /> identified. <br /> Staff said $24 million. <br /> Commissioner McKee said if renovations of older schools are going to cost $26-$33 <br /> million, for 25 years of life, he wonders if a rebuild is a better idea. He said if a rebuild is $40 <br /> million, the total for the 9 schools would be $360 million versus $280-340 million for <br /> renovations. He said new facilities would have a much longer lifespan. He said he is not <br /> advocating this, but wonders if staff has considered renovating versus replacing. <br /> Commissioner Dorosin said if the capacity could be increased, a new one could be built <br /> and an older school knocked out. <br /> Commissioner McKee said he wants to know the options. <br /> Patrick Abele said a feasibility study was done in 2016-17 that helped build the options <br /> being presented this evening. He said staff is recommending option 3, with the Lincoln Center <br /> project, because it impacts the three areas plus the capacity gains from co-locating pre-K <br /> students. He said staff also recommends option 1 for the rest of the locations. He said staff is <br /> cautious of doing major renovations at one school, because it leaves the other needy schools <br /> untouched. He said the final recommendation is approximately $120 million, which would <br /> include option 1 combined with the Lincoln Center project. He said this improves and updates <br /> many schools, as opposed to one location. He said looking at future town growth, staff is also <br /> trying to be strategic in where renovations are taking place, which feeds into long range plans <br /> for reassignment, etc. <br /> Commissioner McKee said he would not advocate tackling all needs at once. He said <br /> the current site for Orange County High School was purchased years ago, and the school board <br /> was highly criticized, as many believed the track of land was too large, but the decision was <br /> exactly the right one to be made. <br />