Browse
Search
2020-278-E Emergency Svc - PLM Equipment Services stretcher maintenance
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-278-E Emergency Svc - PLM Equipment Services stretcher maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 3:03:37 PM
Creation date
5/6/2020 2:51:12 PM
Metadata
Fields
Template:
BOCC
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:294BB418-E1F3-4C25-885F-5006334D0849 <br /> accessories (StoNets, Canvas, IV Poles, Batteries, Oxygen bottle holder etc.)are not <br /> repairable. They must be replaced at owner expense. <br /> ❑ Stair Chair Exclusions <br /> Cable Assembly, Belt Track and Accessories on Stair Chairs are not included in the all <br /> inclusive agreement. Repairs will be made if possible (parts may not be available), but <br /> devices can not be replaced under this agreement. Replacement is at owner expense. <br /> ❑ Power Cot Exclusions <br /> Electronic and Hydraulic Systems are not included in the all inclusive agreement. <br /> Repairs will be made if possible (parts may not be available), but devices can not be <br /> replaced under this agreement. Replacement is at owner expense. <br /> ❑ Power Load / Performance Load Exclusions <br /> Preventive maintenance for PowerLoads and Performance Loads does not include parts <br /> and labor for any repairs that are required. Parts will be billed at list price and labor will <br /> be billed at the rate of$90/hr. <br /> ❑ Fastener Rail <br /> Fastener Rail adjustment is included under this agreement, but not repairs or <br /> replacement. <br /> ❑ Scheduled Work Dates <br /> Every effort will be made by the Company to arrange work dates which will be suitable to <br /> the Customer. If postponement is required by the Customer, it must be requested 72 <br /> hours in advance or a charge of$150.00 will be levied to defray travel costs. <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.