Browse
Search
2020-272-E AMS - Riley Surveying Whitted sewer route camera inspection
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-272-E AMS - Riley Surveying Whitted sewer route camera inspection
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 3:00:17 PM
Creation date
5/6/2020 2:47:34 PM
Metadata
Fields
Template:
BOCC
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:4FE31F34-3D59-4065-92CD-929B08ACFEE8 <br /> Riley Surveying, P.A. <br /> 3326 Durham Chapel Hill Blvd., Ste. B-100 <br /> Durham, North Carolina 27707 <br /> ADDENDUM <br /> TO CONTRACT <br /> DATED MARCH 9, 2020 <br /> DATE: April 7,2020 <br /> CLIENT: County of Orange <br /> 131 West Margaret Lane, Suite 300 <br /> Hillsborough,NC 27278 <br /> Attn: Sandra D'Arensbourg, Capital Projects Manager <br /> PROJECT NAME/LOCATION: Whitted Building Complex <br /> Storm/Sewer Route Camera Inspection <br /> Hillsborough,NC <br /> SCOPE AND EXTENT OF SERVICES: Field measurements, computations, computer <br /> drafting, co-ordination with the Camera Inspection Contractor and Orange County Building <br /> Maintenance necessary to update the existing Topographic Survey of 300 West Tryon Road (PIN <br /> 9864-87-8123) to accurately depict the Storm and Sewer pipe directions/connections as derived <br /> from up to two days of camera information. The survey shall comply with 21 NCAC 56 (NC <br /> Standards of Practice. The survey will be provided as a sealed hardcopy and digital files (unsealed <br /> .pdf& .dwg). Survey to be based on NAVD '88. <br /> Fixed Fee- $5,200.00 (Including Camera Inspection subconsultant fees) plus reimbursables <br /> SPECIAL CONDITIONS: 1)We are prepared to commence work within two weeks.Weather <br /> permitting,please allow approximately one week hence for survey <br /> completion and map delivery. <br /> 2) Underground piping will be based on the inspection report <br /> by a Private Contractor. <br /> The Terms and Conditions following this form are a part of this Agreement. <br /> This Agreement entered into as of the day and year first written above. <br /> CLIENT SURVEYOR <br /> Josue Torres <br /> Authorized Signature Jose L. Torres, PLS <br /> Vice-President <br /> Phone—(919)667-0742 Email:jtorresnrileysurveyingp��.com <br /> NC Firm License C-1281 <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.