Orange County NC Website
6 <br />b. The onsite waterline loop and hydrant system can be constructed as currently <br />designed. <br />c. The domestic water service line for the school site can be constructed as currently <br />designed. <br />d. No substantial impact to the school's construction schedule or onsite construction <br />cast would be anticipated (assuming a timely decision to implement this option). <br />The total estimated cost of Option #2 is $ 600.000. The tank could be in service before <br />the June, 2002 school occupancy date. <br />