Orange County NC Website
ORANGE COUNTY <br />BOARD OF COMMISSIONERS <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting Date: June 19, 2001 <br />Action Agenda <br />Item No. ~ <br />SUBJECT: Cedar Ridge High School Capital Pro~ct Ordinance _ __ __ <br />DEPARTMENT: Budget PUBLIC HEARING: (Y/N) No <br />ATTACHMENT(S): INFORMATION CONTACT: <br />Donna Dean, 245-2151 <br />Attachment 1. Letter of Request from the <br />Orange County Board of Education <br />Attachment 2. OCS Cedar Ridge High <br />School Capital Project Ordinance <br />TELEPHONE NUMBERS: <br />Hillsborough 732-8181 <br />Chapel Hill 968-4501 <br />Durham 68$-7331 <br />Mebane 336-227-2031 <br />PURPOSE: To approve a request from the Orange County Board of Education to increase fire <br />fighting capacity for Cedar Ridge High School. <br />BACKGROUND: <br />Recently Civil Consultants, Inc. conducted a study of several fire protection system options for <br />Cedar Ridge High School for the Orange County Board of Education. According to the <br />infom~ation contained in the attached letter (Attachment 1 of this abstract), the fire suppression <br />capacity, as currently designed, meets minimum State requirements. The Board of Education is <br />interested in taking additional steps to improve safety by increasing the capacity beyond what <br />the State requires. The consultants identified two options: <br />Option #1 -Construction of a private 200,000 gallon cylindrical ground storage tank near the <br />corner of Orange Grove Road and Grady Brown School Road at an estimated cost of <br />$350,000. <br />Option #2 -Construction of a new 250,000 gallon elevated water storage tank at the same <br />location as in Option #1 at an estimated cost of $600,000. <br />Details regarding each option are included in Attachment 1 of this abstract. <br />In keeping with the Commissioner's Policy on Planning and Funding School Capital Projects, <br />the Superintendent has submitted details regarding the change order, in writing, to the County <br />Manager (Attachment 1). The District requests that the Commissioners approve a reallocation <br />of project savings (cun-ently budgeted in the project Contingency) to complete Option #1. <br />