Browse
Search
Agenda - 05-05-20; 8-a - Minutes
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2020
>
Agenda - 05-05-20 Virtual Business Meeting
>
Agenda - 05-05-20; 8-a - Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2020 1:51:21 PM
Creation date
4/30/2020 2:08:33 PM
Metadata
Fields
Template:
BOCC
Date
5/5/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-a
Document Relationships
Agenda 05-05-20 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2020\Agenda - 05-05-20 Virtual Business Meeting
Minutes 05-05-2020 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br /> <br /> Assessment Completed in FY19-20 1 <br /> Recommendations to Repair and Caulk Control Joints and Repair 2 <br />Cracked and Failing Concrete 3 <br /> 4 <br />Commissioner Price asked if there is a timeline for completion on this project. 5 <br />Travis Myren said in July. He resumed the PowerPoint presentation: 6 <br /> 7 <br />Priority Repairs at Eno River Parking Deck (photo) 8 <br /> 9 <br />FY2020-21 Recommended County Projects 10 <br />• Piedmont Food & Agriculture Processing Facility - $115,000 11 <br />o Exterior Signage and Lighting 12 <br />o Update Epoxy Flooring 13 <br />o Interior and Exterior Painting 14 <br />o Funded by Article 46 Sales Tax 15 <br /> 16 <br />FY2020-21 Recommended County Projects 17 <br />• Roofing and Building Façade Projects - $790,000 18 <br /> Decrease of $352,800 from FY2019-20 19 <br />o Update to Roof Asset Management Plan - $130,000 20 <br />o Third Party Annual Roof Inspections & Repairs - $55,000 21 <br />• Design Funds for Library Roof Replacement - $25,000 22 <br /> Replacement Costs in FY2021-22 - $250,000 23 <br />o Southern Human Services Roof Replacement - $580,000 24 <br /> Roofing System is 23 Years Old 25 <br /> Roof Failures Identified Throughout Facility 26 <br /> 27 <br />Southern Human Services Roof (photo) 28 <br /> 29 <br />Chair Rich said this is a good roof for solar panels. 30 <br />Commissioner Price referred to the current library roof, and said there is $25,000 for 31 <br />design and $250,000 for renovations. She asked if there is a reason for this, as the building is 32 <br />not that old. 33 <br />Travis Myren said $25,000 was for design, and $250,000 was for replacement starting in 34 <br />2021-2022. He said the current roof is failing, and he will get details to the Board. 35 <br />Commissioner Greene said the library should not be old enough to need a roof 36 <br />replacement. 37 <br />Travis Myren said he would find the age, and report back to the Board. He resumed the 38 <br />PowerPoint presentation: 39 <br /> 40 <br />FY2020-21 Recommended County Projects 41 <br />o Vehicle Replacements - $2,434,325 42 <br />o Public Safety Priorities 43 <br /> Animal Services remounted vehicle $50,000 44 <br /> Emergency Services vehicles $964,961 45 <br /> Sheriff’s Office vehicles $230,000 46 <br /> Total Public Safety $1,244,961 47 <br />o Transportation and Environmental Health 48 <br /> Environmental Health vehicle $36,000 49 <br /> OCPT Bus/Van replacements (see note) $1,153,364 50
The URL can be used to link to this page
Your browser does not support the video tag.