Orange County NC Website
8 <br /> <br /> Assessment Completed in FY19-20 1 <br /> Recommendations to Repair and Caulk Control Joints and Repair 2 <br />Cracked and Failing Concrete 3 <br /> 4 <br />Commissioner Price asked if there is a timeline for completion on this project. 5 <br />Travis Myren said in July. He resumed the PowerPoint presentation: 6 <br /> 7 <br />Priority Repairs at Eno River Parking Deck (photo) 8 <br /> 9 <br />FY2020-21 Recommended County Projects 10 <br />• Piedmont Food & Agriculture Processing Facility - $115,000 11 <br />o Exterior Signage and Lighting 12 <br />o Update Epoxy Flooring 13 <br />o Interior and Exterior Painting 14 <br />o Funded by Article 46 Sales Tax 15 <br /> 16 <br />FY2020-21 Recommended County Projects 17 <br />• Roofing and Building Façade Projects - $790,000 18 <br /> Decrease of $352,800 from FY2019-20 19 <br />o Update to Roof Asset Management Plan - $130,000 20 <br />o Third Party Annual Roof Inspections & Repairs - $55,000 21 <br />• Design Funds for Library Roof Replacement - $25,000 22 <br /> Replacement Costs in FY2021-22 - $250,000 23 <br />o Southern Human Services Roof Replacement - $580,000 24 <br /> Roofing System is 23 Years Old 25 <br /> Roof Failures Identified Throughout Facility 26 <br /> 27 <br />Southern Human Services Roof (photo) 28 <br /> 29 <br />Chair Rich said this is a good roof for solar panels. 30 <br />Commissioner Price referred to the current library roof, and said there is $25,000 for 31 <br />design and $250,000 for renovations. She asked if there is a reason for this, as the building is 32 <br />not that old. 33 <br />Travis Myren said $25,000 was for design, and $250,000 was for replacement starting in 34 <br />2021-2022. He said the current roof is failing, and he will get details to the Board. 35 <br />Commissioner Greene said the library should not be old enough to need a roof 36 <br />replacement. 37 <br />Travis Myren said he would find the age, and report back to the Board. He resumed the 38 <br />PowerPoint presentation: 39 <br /> 40 <br />FY2020-21 Recommended County Projects 41 <br />o Vehicle Replacements - $2,434,325 42 <br />o Public Safety Priorities 43 <br /> Animal Services remounted vehicle $50,000 44 <br /> Emergency Services vehicles $964,961 45 <br /> Sheriff’s Office vehicles $230,000 46 <br /> Total Public Safety $1,244,961 47 <br />o Transportation and Environmental Health 48 <br /> Environmental Health vehicle $36,000 49 <br /> OCPT Bus/Van replacements (see note) $1,153,364 50