Orange County NC Website
13 <br /> <br />Commissioner Marcoplos said the price the Board got back originally was cost 1 <br />prohibitive, and it was for some type of septic system, as opposed to connection to the water 2 <br />and sewer system. 3 <br />Travis Myren said staff looked at alternatives to have a type of treatment on site, and 4 <br />cost was one of the factors, as well as discharge. 5 <br />Commissioner Marcoplos said part of the discussion was that Chapel Hill wanted a 6 <br />soccer field there. He said it would make sense to connect to the main water line, and to use 7 <br />that land for affordable housing. 8 <br />Chair Rich said the CHCCS boundary line did not include the Millhouse park area, which 9 <br />was also a concern to those in the mobile home parks as their children would have to change 10 <br />schools. 11 <br />Chair Rich asked if this is just a placeholder in the CIP. 12 <br />Travis Myren said yes, and it would be deferred until staff finds out if the County needs 13 <br />this space for other purposes. He resumed the PowerPoint presentation: 14 <br /> 15 <br />FY2020-21 Recommended Parks, Open Space, and Trail Development Projects 16 <br />• Park and Recreation Facility Renovations, Repairs, and Safety Improvements - 17 <br />$180,000 18 <br />o Annual Request for Ongoing Capital Improvements 19 <br /> Parks Facility Repairs and Replacement 20 <br /> Safety Improvements 21 <br /> Site Lighting 22 <br /> Landscaping 23 <br /> Signage 24 <br /> Preventative Maintenance 25 <br /> 26 <br />FY2020-21 Recommended Water and Sewer Infrastructure Projects 27 <br />• Economic Development Water & Sewer Infrastructure - $130,000 28 <br />o Engineering and Design Service to Serve 200 Acres with Rail Access 29 <br />o 8:22pm Continued Investment in Site Readiness 30 <br />o Zoned Economic Development – Buckhorn EDB – 1 31 <br /> Light industrial 32 <br /> 200 acres total 33 <br /> Access improvements needed 34 <br />o Construction FY2021-22 - $1.23 million 35 <br /> 36 <br />Commissioner Dorosin said it would be worthwhile to hear from Steve Brantley, 37 <br />Economic Development Director, as to how important rail access is to this area. 38 <br />Travis Myren said there is a spreadsheet that he can share with the Board. He resumed 39 <br />the PowerPoint presentation: 40 <br /> 41 <br />Efland/Buckhorn/Mebane Utility Planning Area (master plan) 42 <br /> 43 <br />Solid Waste Facilities (map) 44 <br /> 45 <br />FY2020-21 Recommended Solid Waste Projects 46 <br />• Solid Waste Projects 47 <br />o Construction & Demolition Landfill Equipment Replacement 48 <br /> Replace Holland Tractor - $100,000 49 <br />o Comprehensive Solid Waste Management Plan - $125,000 50