Browse
Search
Agenda - 05-05-20; 8-a - Minutes
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2020
>
Agenda - 05-05-20 Virtual Business Meeting
>
Agenda - 05-05-20; 8-a - Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2020 1:51:21 PM
Creation date
4/30/2020 1:33:05 PM
Metadata
Fields
Template:
BOCC
Date
5/5/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-a
Document Relationships
Agenda 05-05-20 Virtual Business Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2020\Agenda - 05-05-20 Virtual Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br /> <br />o Seymour Center Security Cameras - $8,500 1 <br />o Whitted Security Cameras - $5,000 2 <br />o OCPT Fire Alarm System Upgrade - $9,600 3 <br /> 4 <br /> 5 <br />FY2020-21 Recommended County Projects 6 <br />• Generator Projects - $450,000 7 <br /> Increase of $292,000 from FY2019-20 8 <br />o Emergency Generator for Courthouse - $450,000 9 <br /> Energize the Entire Facility – 64, 934 Square Feet 10 <br /> Provide Seamless Court Operations during Power Disruption 11 <br /> 12 <br />FY2020-21 Recommended County Projects 13 <br />• Heating Ventilation and Cooling Projects - $416,000 14 <br /> Decrease of $816,500 15 <br />o Humidity Impact Study - $25,000 16 <br /> Recommend Upgrades and Replacements to Address Humidity 17 <br />o HVAC Equipment Assessment Countywide - $30,000 18 <br /> Recommend Schedule for Upgrades and Replacements 19 <br />o HVAC Major Component Replacement – $150,000 20 <br /> Replace Motors, Compressors to Extend Useful Life of Equipment 21 <br />o Gateway Center HVAC Replacement - $176,000 22 <br /> Condominium Arrangement 23 <br /> Units are 13 Years Old 24 <br /> Impacted by Roof Fire in 2015 25 <br />o Engineering and Design for Whitted Replacement – $35,000 26 <br /> Serves 63,000 square feet of Office, Medical, and Dental Suites 27 <br /> System is 17 Years Old 28 <br /> Full Replacement in FY21-22 - $350,000 29 <br /> 30 <br />Commissioner Marcoplos asked if there would be energy savings from all of this HVAC 31 <br />related work. 32 <br />Travis Myren said there are efficiency gains with new equipment, and he said staff could 33 <br />provide this information. He resumed the PowerPoint presentation: 34 <br /> 35 <br />FY2020-21 Recommended County Projects 36 <br />• Lake Orange Dam Remediation - $150,000 37 <br /> Increase of $55,000 from FY2019-20 38 <br />o 2018 Department of Environmental Quality Inspection 39 <br />o Deficiencies Documented – Long Term Repair Plan Created 40 <br />o Total Estimated Cost of $2.76 million Over Next Five Years 41 <br />o FY2020-21 Projects: Repair Existing Erosion Control Barrier 42 <br /> 43 <br />Existing Erosion Control Barrier (photo) 44 <br /> 45 <br />FY2020-21 Recommended County Projects 46 <br />• Major Plumbing Repairs - $45,000 47 <br /> Decrease of $205,778 from FY2019-20 48 <br />o Seymour Center Hot Water Heaters - $45,000 49 <br /> Units are 13 Years Old and Showing Signs of Failure 50
The URL can be used to link to this page
Your browser does not support the video tag.