Orange County NC Website
22 <br /> NOTES: PLANS PREPARED FOR: <br /> 1. ALL PROPOSED EQUIPMENT TO BE PAINTED TO ■ <br /> MATCH EXISTING Aar verizon,' <br /> 2 THE DRAWING IS ONLY A GRAPHIC REPRESENTATION <br /> OF THE STRUCTURE. CONDITIONS IN THE FIELD MAY 8921 Research Drive <br /> VARY. _ Charlotte,NO 28262 <br /> _ (704)519-9957 <br /> 3. ALL PROPOSED EQUIPMENT TO BE MOUNTED PER PROJECT INFORMATION: <br /> MANUFACTURER'S SPECIFICATIONS. _ <br /> y�—� _ VZW SITE NAME: SMC <br /> �I ORANGE COUNTY <br /> SPORTS COMPLEX <br /> 101 MEADOWLANDS DRIVE <br /> HILLSBOROUGH,NC 27278 <br /> (ORANGE COUNTY) <br /> PLANS PREPARED BY: <br /> PHOTO OF BUILDING ELEVATION <br /> SCALE: N.T.S. <br /> TOWER ENGINEERING PROFESSIONALS <br /> 326 TRYON ROAD <br /> PROPOSED VERIZON SLED RALEIGH.NO 03-3530 <br /> MOUNTED ANTENNA WITH OkFE�(9 ) 1-6351 <br /> CONCEALMENT CANNISTER <br /> (TYP OF 3). SEE SHEET C-5 le m net <br /> FOR DETAILS. NEN E -1794 <br /> 3g'_10•* PROPOSED SLED MOUNT SEAL: <br /> AN <br /> PPVRTENANCE WITH CONCEALMENT SHROUD tttl�t t tt���h <br /> (TYP OF 3). SEE APPENDIX <br /> FOR DETAILS.ROPOSmSEALTENNAS }TC <br /> �T�'k-162-11 <br /> ______________—_ 033734 J = <br /> ET '�G� C0� iGINOF d/ M.0FTOP �i� Nt � <br /> Vie,-6er S,2019 <br /> e 12-05-1e CONSTP.ULTgN <br /> 0'-0"3 (REFERENCE) 5 11-11-15 CON5TRUCT101J <br /> EXISTING GRADE — — — — — — — — — — — — — — — — — — — — — — — — — _ <br /> 7 -OI-IS COIISTPLCTION <br /> =III-111=III-1�-1 I I-1 I I=1 I I=111=11=ll1=11=1 I I=1=I 11=III=1 11=1 11=I 11=III=I 11=1 11=1 11=I 11=1 I I=1 11=1 I I—III—III—III—III—III—I 11=III—III—III 11=1—III—III—III—III—III—III—I 11=1 I I—III—III—I 11=I 11=1 11-11' <br /> Ill=W=1 I L—I I Id 11=II I—L=1I1-1=II I— =1I 1=1=W=L1=1 11=1�=1 11=1 11=1I 1=1I 1=1=W=1 I1=1 11=1I 1=1 11=1 11=1�=1I 1=1�I1=1 I1=1I 1=1=1 I1 =1I H I 1=1 I1=1 I=1I 1=1 11=1 11=1 I1=1 11=1 I I�I'= 6 01-24-19 C0K5TRUGn0W <br /> "I—III=III=III=III=III—III—III—III—III-1=III=III=III=III=III=�=III=III=III=III—n—u—w—III-III-III-11111 L—III=III=III=III 11—III=III=11L— _�=III=III=III—III I_I11= REV 7ATE ISSUEti F]Ir <br /> —111_llf�111LI-lll-fif-lff-lfl-fll-lll=llI=LL1=ll1=lll=lll=lLl-111='�'— --—111= f lll=ll1�11-111-1�ll—lll— �11-1LI LLI 111-1LI-111-1�L�L <br /> -11 IIiTj1 LITII1111111 II II II II 1L-1 III—"' "1-1I 1-1I it II IlIT� IT, II II III-1 <br /> _ — — — DRAWN BY:SAM CHECKED BY: SCe <br /> SHEET TITLE: <br /> BUILDING ELEVATION <br /> SHEET NUMBER: REVISION: <br /> BUILDING ELEVATION (WESTERN VIEW) G+_'? 9 <br /> SCALE., ,. - <br /> J TEAk T9472 <br />