Orange County NC Website
10 <br /> Appendix A: Complete CFE Project Scoring Table: <br /> Social Ease of <br /> Justice Efficient under- Likeli- <br /> /Racial use of Time to standing hood of <br /> Equity Emissions Funds Com- and success <br /> Cost 0 to 3 Reduced 0 to 2 plete 0 messaging 0 to 1 <br /> Project Estimate is 10 to 2 pts) is to 1 t : (0 to 1 pt1: Total Rank* <br /> Supplemental <br /> Weatherization for $150,000 3 1 2 1 1 1 9 1 <br /> Low Income <br /> Households <br /> Countywide LED $19,272 <br /> Campaign 3 1 2 1 1 1 9 2 <br /> Rooftop solar-OCS $150,000 2 1 2 1 1 1 8 3 <br /> Rooftop solar- $150,000 2 1 2 1 1 1 8 3 <br /> CHCCS <br /> Small hydropower <br /> $30,000 1 1 1 1 1 1 6 4 <br /> feasibility study <br /> Total <br /> (Max for 2019-20 is $499,272 <br /> $469,272) <br /> *All projects, including those that tied in their scoring and those that exceeded the FY20 funding limit <br /> were placed in rank order by CFE voting. <br /> Appendix B: Other projects that might be considered for future funding: <br /> These projects were not reviewed by the CFE, but as the County moves forward these and other ideas <br /> may be good candidates for elaboration and review: <br /> • Assisting OWASA in the development of a biodigester to make productive use of the waste gases <br /> at their water treatment plant that are currently flared. <br /> • Investments in resiliency for vulnerable communities as determined by the ongoing update to <br /> the Eno-Haw Hazard Mitigation Plan. <br /> • Energy Efficiency Grant Program or Revolving Loan Fund <br />