Browse
Search
Agenda - 06-14-2001-4d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 06-14-2001
>
Agenda - 06-14-2001-4d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 2:21:00 PM
Creation date
8/29/2008 10:33:00 AM
Metadata
Fields
Template:
BOCC
Date
6/14/2001
Document Type
Agenda
Agenda Item
4d
Document Relationships
Minutes - 06-14-2001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County <br />Needs Assessment Project <br />Page 12 <br />with non-standard information from vendor to vendor. A purchasing system that is Web- <br />enabled to allow the vendor to enter all information online, including commodity codes <br />for all applicable offerings, would result in an efficient process for maintaining a <br />standardized vendor database. This would enable the;.County to consistently request bids <br />and proposals from all registered vendors that offer the desired good or service. <br />Issue 4: Vendors frequently contact Purchasing to request a modification to a purchase <br />order. Purchasing generally makes the .adjustment, which requires updated pricing, <br />inclusion of freight charges, etc. A standard purchase order system could be configured <br />to prompt the requesting department for ancillary chazges such as freight or sales tax. <br />BUDGETING: <br />Issue 1: The current budget system was created in-house by Budget staff and integrates <br />Excel spreadsheets and Word documents. The system utilizes source spreadsheets <br />containing amounts for individual line items in each department. In order to summarize <br />that information at various levels, (functional, category, fund), it is necessary to create <br />. links from the source ,spreadsheet. This causes the system to be very fragile and labor <br />intensive. For example, with the creation of a new department, Budget staff must <br />manually update all summary spreadsheets to include the new links. In addition, staff <br />must constantly check to ensure that all "checks and balances" are in place at all times.. <br />Issue 2: Budget data (including requested, recommended, approved and final actual <br />amounts) must be manually entered into each department's individual source spreadsheet. <br />As part of an integrated solution, historic data and budget information would be stored in <br />a shazed database, automatically updating the files in .both the general ledger .and the <br />budget systems. <br />Issue 3: The current budget system has a very limited capability to maintain different <br />versions of the budget. For example, during budget prepazation, it is important that staff <br />be able to perform "what-if' analyses on different levels of revenues and expenses. With <br />the existing system, the staff time required to perform these analyses is too prohibitive to <br />analyze every desired option. <br />Issue 4: During the yeaz, it is necessary for departments to transfer budgeted funds <br />between operating Iine items. To accomplish this task, the department prepazes a transfer <br />request and forwards it to the Budget department. The Budget staff then manually keys <br />the transfer information into the mainframe general ledger system. ,After creating and <br />posting the batch, the Budget office maintains one copy of the transfer. and returns <br />another copy to the originating department. Anew budget system would, allow <br />departments to make pre-approved line item transfers on-line, reducing the paper and <br />staff time required by the current system. <br />Issue 5: An interface between the Budget system and the Personnel system does not <br />exist. The creatian and maintenance of the annual budget relies heavily on information <br />
The URL can be used to link to this page
Your browser does not support the video tag.