Browse
Search
2020-232-E Solid Waste - Hammerstruck breakroom repair
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-232-E Solid Waste - Hammerstruck breakroom repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 2:20:25 PM
Creation date
4/16/2020 10:54:17 AM
Metadata
Fields
Template:
BOCC
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:5C96407F-01C8-436B-9803-438A891DFC99 <br /> H ig%MS ERTFIC <br /> (991 93 13394- 1 O01 <br /> February 12, 2020 <br /> Bid Proposal <br /> Owner Information <br /> 1514 Eubanks Rd Contractor Information <br /> Chapel Hill, NC 27615 Hammer5truck LLC <br /> Garrett Paschall: License#80246 <br /> Project Name: Floor Repair <br /> Scope <br /> Permits will be pulled of this job because repairs will be made to floor joist and the subfloor. <br /> The first step in repairs will be to remove the ice machine, drink machine and stove. Once all <br /> appliances are removed from the kitchen area,the flooring squares will be removed to expose <br /> the sub floor.Any water damaged areas of the sub floor will be replaced.When the sub floor is <br /> removed the damaged joist will be exposed so repairs can be made. New joist will be siste red <br /> or completely replaced with the existing water damaged joist. After all repairs are made to the <br /> floor joist the floor system will be inspected. The new subfloor sheathing will be installed and <br /> adequately nailed down to ensure a solid floor. The new kitchen floor will be installed utilizing a <br /> vinyl plank because it is secure with a waterproof seal and is scratch and dent resistant. Once <br /> the new floor is installed,the stove and drink machine will be returned to their original <br /> location.A metal drain pan will be installed in the ice machine location. once the drain pan is <br /> installed,the ice machine will be re installed and all new plumbing will be installed unsure <br /> proper and efficient drainage farm the ice machine. When work is complete finial inspection <br /> will be conducted. <br /> Material & Costs <br /> Description Quantity <br /> Ply board sheets 2 <br /> 2x6x8 ft S <br /> Plumbing material <br /> Shoe molding <br /> Transition strip <br /> Vinyl Plank 270 square feet <br /> Drain pan <br /> permits <br /> Total Estimated casts: $3,980.00 <br /> Total Estimated Time Frame: 3 days <br />
The URL can be used to link to this page
Your browser does not support the video tag.