Browse
Search
2020-231-E AMS - Racanelli Construction PFAP disconnect
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-231-E AMS - Racanelli Construction PFAP disconnect
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 2:19:47 PM
Creation date
4/16/2020 10:53:48 AM
Metadata
Fields
Template:
BOCC
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: FA8009F9-A6EA-462D-967D-8806A026773B <br /> Racanelli Construction South, Inc. Potential Chang e <br /> Racanelli 1001 Pemberton Hill Road, Suite 202 <br /> Apex, NC 27502 Order (PCO) <br /> SUBMITTED TO: Piedmont Food and Ag Freezer <br /> Orange County <br /> 131 West Margaret Lane RCS PROJECT NO.# <br /> Hillsborough, NC 27278 19-008 PCO#7 <br /> ATTN;Angel Barnes PCO STATUS PCO. ISSUE DATE <br /> 1 3/25/20 <br /> DESCRIPTION OF CHANGE: <br /> Provide power with means of disconnecting to the evaporator units as well as a GFCI service <br /> receptacle within the two new freezers as required by building code. <br /> ® DOCUMENTS ARE ENCLOSED. <br /> SUBCONTRACTOR/SUPPLIER DISTRIBUTION: <br /> Sunnydale Electric Inc. <br /> STATUS: <br /> 1 ® Price quotations are requested within 3 working days from the date of this Potential Change Order. No work is <br /> authorized until proposals are accepted and written authorization is given to proceed. <br /> 2 ❑ All concerned are authorized to proceed with the work of this Potential Change Order. Price quotations are requested <br /> within 3 working days from the date of this PCO. <br /> 3 ❑ All concerned are authorized to proceed with the work of this Potential Change Order on a time and material basis. <br /> Daily time and material slips must be signed by an authorized representative of RCS for verification of time and <br /> materials utilized to complete the work requested. <br /> CC: SWD/File BY: Scott W.Drebltlzo <br /> DL/Field Vice President <br /> NOTES: 1.)Subcontractors receive all PCO's via email unless otherwise noted. <br /> 2.)This change may affect project completion schedule. All Subcontractors must advise in writing of any impact of this change on their operation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.