Browse
Search
2020-231-E AMS - Racanelli Construction PFAP disconnect
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-231-E AMS - Racanelli Construction PFAP disconnect
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 2:19:47 PM
Creation date
4/16/2020 10:53:48 AM
Metadata
Fields
Template:
BOCC
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: FA8009F9-A6EA-462D-967D-8806A026773B <br /> r-1cu111V11L rood and Ag Freezer <br /> Racanelli Change Order Request <br /> Racanelli Construction South, Inc. Proposal and Pricing Summary <br /> 1001 Pemberton Hill Road,Suite 202 RCS Project#19-008 <br /> Apex,NC 27502 Date: 3/25/2020 <br /> Submitted To: <br /> Orange County <br /> 131 West Margeret Lane COR#7 <br /> Hillsborough, NC 27278 <br /> Attention : Angel Barnes via email <br /> Per RCS PCO#7 dated 3/25/20, we are pleased to provide the following proposal to provide power with means of <br /> disconnecting to the evaporator units as well as a GFCI service receptacle within the two new freezers as required by <br /> building code. <br /> Labor Material <br /> Unit Unit Sub Unit Labor Material Subcontractor <br /> Item Qty Unit Price Price Price Total Total Total Total <br /> unny a e Electric Inc. see attached <br /> 1 proposal) 1 LS $ 500.00 $ 500.00 $ 500.00 <br /> Subtotals $0.00 $0 $ 500.00 $ 500.00 <br /> Small Tools&Consumables @ 5% on <br /> General Conditions 10% on $500 $ 50.00 <br /> Labor Burden 38% on $ - <br /> Sales Tax on Materials 7.50% on $ - <br /> Racanelli Construction South Overhead @ 10% on $ 550.00 $ 110.00 <br /> Racanelli Construction South Profit @ 5% on $ 660.00 $ 60.50 <br /> Insurance Premium @ 1.35% on $ 720.50 $ 17.15 <br /> TOTAL AMOUNT OF CHANGE ORDER REQUEST $ 7ss <br /> TOTAL TIME (CALENDAR DAYS) REQUESTED FOR THIS CHANGE <br /> Change Order Request accepted and authorized for contract Change Order <br /> Authorized By Architect: Date: <br /> Authorized By Owner: Date: <br /> cc: SD/file <br /> Notes: 1.)We reserve the right to claim additional cost and time extensions associated with this COR at a later time. <br /> We Have Not been authorized to proceed with this work. By: saott w.DrebCtlzzo <br /> This Proposal may be withdrawn from us if not accepted within 15 Days. Vice President <br />
The URL can be used to link to this page
Your browser does not support the video tag.